Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ]UDC Manufacturer Industry Standard Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure Vacuum Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution:0.00" <br /> UDC#1-2 UDC#3-4 UDC#5-6 UDC#7-8 <br /> UDC Manufacturer: Unknown Unknown Unknown Unknown <br /> UDC Material: Plastic Plastic Plastic Plastic <br /> UDC Depth: 39.00" 39.00" 39.000 39.00" <br /> Height from UDC Bottom to Top 12.00' 13.00" 13.00" 12.00" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 8.00" 7.00" 8.00" 8.00" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Clean dry Clean dry Clean dry Clean dry <br /> testing: <br /> Portion of UDC Tested' 4.00"above highest pipe U 4.00"above highest pipen 4.00"above highest pipe M 4.00"above highest pipe <br /> Does turbine shut down when J Yes ❑No ❑NA <br /> UDC sensor detects liquid(both k Yes LlNo 11NA Yes ❑No [INA G Yes a No NA <br /> product and water)? <br /> Turbine shutdown response time Immediate' Immediate' Immediate' Immediately <br /> Is system programmed for fail- Yes - No FNA , Yes ❑No i NA Ycs No NA V Yes 71 No NA <br /> safe shutdown? <br /> Was fail-safe verified to be 7,Yes No NA <br /> Yes —No NA L7 Yes _No NA + Yes No NA <br /> operational?` <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 mn 5 min <br /> starting test <br /> Test Start Time: Q <br /> Initial ReadingR,): <br /> Test End Time: Please See 11„„1 C O 1„„1 results .,r eS U I}`S <br /> Final Reading(RF): <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or Criteria: 0.002" 0.002" 0.002" 0.002" <br /> Test Result: ❑ Pass 7 Fail 0 Pass Fail Pass Fail v Pass ❑Fail <br /> Was sensor removed for testing? Yes No NA ,,Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and Yes _,No NA2 Yes ❑No 11 NA -0 Yes i.❑No ❑NA < Yes No NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />