My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
21
>
2900 - Site Mitigation Program
>
PR0522688
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 11:34:22 PM
Creation date
2/28/2020 4:51:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0522688
PE
2950
FACILITY_ID
FA0015464
FACILITY_NAME
PIZZA HUT RESTAURANT
STREET_NUMBER
21
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04305013
CURRENT_STATUS
01
SITE_LOCATION
21 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C O R - <br /> Ms Mary Schulz <br /> June 3, 2004 <br /> Page 4 <br /> SECOR will exercise the industry standard of care in an attempt to identify and locate potential <br /> underground structures utilizing personal knowledge provided by the facility owner and/or operator, <br /> private utility location service, public underground utility location services (assuming the region is <br /> equipped with public utility one-call notification service), and hand digging the initial ground surface <br /> penetration at each respective borehole location to a depth of approximately 5-feet bgs using a hand <br /> auger of equal or greater diameter than the proposed drilling equipment. More exhaustive methods <br /> to locate potential unknown underground manmade structures, such as geophysical or design/as- <br /> built records search techniques, were not requested and are not included in this proposal. <br /> PROJECT SCHEDULE <br /> SECOR is prepared to proceed with this work immediately upon receipt of your written authorization. <br /> SECOR will provide final reports to GE Franchise Finance by June 24, 2004. <br /> AUTHORIZATION <br /> For your convenience, an Authorization Form (Attachment 2) has been included to expedite the <br /> commencement of the work described in this proposal. Authorization may be made by signing in the <br /> space provided and returning an executed copy to our attention by facsimile at (503) 692-7074, or by <br /> your preferred method. <br /> The conditions of this proposal will remain in effect until July 3, 2004. SECOR appreciates the <br /> opportunity to provide environmental services to GE Franchise Finance. If you have any questions <br /> or this proposal does not accurately reflect your intentions, please contact us at(503) 691-2030. <br /> Sincerely, <br /> SECOR International Incorporated <br /> Jes is Jenkins D. Howe Gates <br /> Senor Environmental Scientist Principal Scientist <br /> Attachments: 1. Assumptions <br /> 2. Task Authorization Form <br /> 15g-04-149-Lod!PHII SECOR International Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.