Laserfiche WebLink
SOIL SUITABILITY/NITRATE LOADING STUDY <br />NILE GARDEN ELEMENTARY SCHOOL <br />5700 EAST NILE AVE., APN: 226-07-003 <br />MANTECA, CALIFORNIA <br />This report includes the results of a Soil Suitability/Nitrate Loading Study for Manteca Unified School <br />District's (MUSD) Nile Garden Elementary School Modernization Project located at 5700 East Nile <br />Avenue in Manteca, California (the Site). Figure 1 (Appendix A) presents a Vicinity Map of the Site and <br />Figure 2 (Appendix A) presents a Site Map/Aerial Photograph. <br /> <br />1.0 SOIL SUITABILITY STUDY <br /> <br />1.1 INTRODUCTION AND DEVELOPMENT <br />The Soil Suitability Study (SSS) was conducted to determine whether Site soils are suitable for expansion <br />of the septic system. The SSS was performed pursuant to requirements of Section 9-1105.2(d) of the San <br />Joaquin County Development code and has been prepared to meet the requirements of the San Joaquin <br />County Environmental Health Department's (EHD's) Soil Suitability Study Requirement Checklist (dated <br />9/25/07). A major element of the field work included conducting percolation tests that meet absorption rates <br />as specified by EHD. A review of published soil information, geologic maps, and available groundwater <br />information was also conducted. <br />1.1.1 Description of Site, Including Zone Information <br />The Nile Garden Elementary School property is located in the northern San Joaquin Valley approximately <br />3 miles southwest of Manteca. The approximately 15-acre site (APN: 226-07-003) is generally rectangular <br />in shape and surrounded by mixed agriculture and rural residential development. East Nile Avenue is <br />immediately to the north. The Site elevation is approximately 30 feet above mean sea level and the land is <br />relatively flat (less than 2 percent slope). The topographic gradient slopes gently west toward the San <br />Joaquin River approximately 6 miles away. <br />1.1.2 Description of Proposed Development <br />We understand that design for the proposed project is currently underway and final details are not available <br />as of this writing. On a preliminary basis, we understand the proposed construction will include a new <br />multi-purpose building of 14,600 square feet, and a kindergarten classroom building of 4,500 square feet. <br />The proposed layout for the Nile Garden Elementary School new building locations, and existing buildings <br />is shown on Figure 3, Appendix A. <br />1.1.3 Parcel Vicinity Location Map <br />See Figure 4, Appendix A. <br />1.1.4 Site Map Showing Location of All Items on Parcels (i.e., Structures, Drives, Wells, Septic <br />Systems, Large Trees, Pastures, Pools, Natural Drainage Courses, Ponds, Waterways, Etc.) <br />See Figures 2, 3, and 5, Appendix A. <br />0 CONDOR