My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2325
>
2200 - Hazardous Waste Program
>
PR0505915
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 11:19:40 AM
Creation date
3/2/2020 11:01:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505915
PE
2227
FACILITY_ID
FA0007080
FACILITY_NAME
BBB Industries DBA QBR BRAKE INC
STREET_NUMBER
2325
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
Way
City
Stockton
Zip
95206
APN
16334008
CURRENT_STATUS
02
SITE_LOCATION
2325 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
757
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br />1.8 Reporting and Record keeping Requirements <br />1.8.1 Weekly Facility Inspections <br />Once each day during the monitoring period (October 1 to September 30) <br />designated personnel shall inspect the site to assess the facility's level of <br />compliance with its BMPs. Using QBR=s Weekly Facility Inspection <br />Report Form (see Section 4: Form 1) site personnel shall record the <br />inspection findings to insure and certify the facility is implementing of QBR=s <br />BMPs. <br />The Weekly Facility Inspection Reports are important to QBR=s storm water <br />management efforts. These reports shall be used to demonstrate the facility's <br />level of compliance with the monitoring and BMP requirements of the <br />GENERAL PERMIT, and to evaluate the effectiveness of the QBR=s <br />implementation its SWPPP and BMPs <br />1.8.2 Comprehensive Site Compliance Evaluation (CSCE) <br />The purpose of the Comprehensive Site Compliance Evaluation (CSCE) is to <br />provide an assessment of the QBR=s compliance status with the <br />requirements of the GENERAL PERMIT, as well as the overall effectiveness <br />of the QBR=s storm water management efforts. The CSCE will be <br />conducted by the site's SWPPT and/or its designated representative at least <br />annually. <br />The CSCE will be conducted to determine if all storm water pollution <br />prevention measures are accurately identified in the QBR=s SWPPP, and that <br />the BMPs are in place and working properly. The CSCE is in addition to the <br />weekly facility inspections (see Section 1.8.1). <br />The CSCE will be performed by the facility=s SWPPT. The SWPPT may <br />accompanied by other employees who are familiar with both the site=s <br />operations as well as the goals and requirements of the site's SWPPP. <br />The process for conducting the CSCE will include: <br />X Reviewing site compliance and program documentation; <br />X Developing a list of items which are part of the material handling, <br />CATEMMMPREV2.doc Section 1-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.