My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2325
>
2200 - Hazardous Waste Program
>
PR0505915
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 11:19:40 AM
Creation date
3/2/2020 11:01:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505915
PE
2227
FACILITY_ID
FA0007080
FACILITY_NAME
BBB Industries DBA QBR BRAKE INC
STREET_NUMBER
2325
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
Way
City
Stockton
Zip
95206
APN
16334008
CURRENT_STATUS
02
SITE_LOCATION
2325 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
757
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/4/96 <br />Placed processed form 5021 in file. MK <br />11/15/96 <br />Cecilia phoned from QB Rebuilders who informed me that the tonnage was closer to 55 not 632. I asked <br />for a copy of their BOE summary form for 1995 for H.W. so that I can change her billing status. KF <br />11/20/96 <br />Received manifest info from Cecilia, the tonnage calculates out to 44 tons not 632.5 tons. There were 4 <br />not 5 manifests as reported by Noe because on manifest was from 1994. I will submit a 5021 to change <br />status and rebill for 22.28 category. KF <br />12/6/96 <br />Conduct routine inspection. The reported tonnage for'93,'94 and'95 is not same as inspected. There are <br />several violations. See HW inspection report. <br />Per KF and DW consultation, sample may be needed to determine the illegal disposal. MK <br />12/9/96 <br />Returned Mr Noe Gonzales' call regarding his missing manifests. Informed him a copy of signed manifest <br />and bill of laiding is okay. MK <br />1/7/97 <br />Placed form 5021 in file. MK <br />1/9/97 <br />Discussed the item 75 C with KF. The owners/operators can sample and investigate the release themselves. <br />MK <br />1/14/97 <br />Returned call to Dave Harmen, new manager. We discussed each violation. <br />I advised Mr. Harmen to take sample in storm drain and pond to see if asbestos had been released into <br />them. He needs to submit result to EHD. Also informed him to let me know which lab he will use. He <br />acknowledged. <br />Mr. Noe Gonzales called to request a 30 -day extension for contingency plan completion. I told him that's <br />okay. He asked for a written approval. I told him verbal approval would be fine. MK <br />2/10/97 <br />Received & placed in file the certificate of return to compliance. Mr. Harmen will advise EHD the final <br />result of his test of the water and pond. MK <br />3/3/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.