My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011703
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
27383
>
2900 - Site Mitigation Program
>
PR0004192
>
ARCHIVED REPORTS_XR0011703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 5:07:13 PM
Creation date
3/3/2020 4:46:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011703
RECORD_ID
PR0004192
PE
2951
FACILITY_ID
FA0004007
FACILITY_NAME
GLENBRIAR ESTATES/L T PEREIRA
STREET_NUMBER
27383
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
24804003
CURRENT_STATUS
02
SITE_LOCATION
27383 S MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` These results indicate that the only area of soil containing petroleum constituents is that area <br /> l l near the former fill pipe location. It appears that the area is limited to the areas around borings <br /> B-3 and B-4 and limited in depth to between 10 and 20 feet bgs. <br /> F, <br /> F; AEMC recommended "no further work and permanent closure" for tanks T-1 and T-2 and <br /> Frecommended excavation of soil around the former fill pipe area of tank T-3. <br /> 44 <br /> FREMEDIATION <br /> F <br /> Soil Excavation <br /> F <br /> AEMC submitted a Phase III Remediation Proposal on October 23, 1991. This proposal <br /> presented a plan for excavation of approximately 40 cubic yards of soil containing diesel <br /> � I <br />� ' constituents from the area near the former fill pipe location of tank T-3, collection and analysis <br /> Fof soil samples to verify removal of soil containing diesel constituents above cleanup goals, and <br /> disposal of excavated soil. <br /> F <br /> FThe activities described in the proposal were initiated on December 10, 1991. Excavated soil <br /> was placed on visqueen. The backfill material replaced in the tank excavation was removed and j <br /> I <br /> N ' placed in stockpile SP-1. Excavation continued in the southwest corner of theP it to remove soil <br /> r: <br /> that was visibly stained. The visibly-stained soil was confined to a Iayer about 10 feet thick <br /> approximately 10 feet below the ground surface. Clean soil above this layer was removed and <br /> Fi r1-n1a12.rpt 14 December 11, 1992 <br />[7 <br /> r � <br />
The URL can be used to link to this page
Your browser does not support the video tag.