Laserfiche WebLink
TEST PIT NUMBER: TP-3 PAGE 1OF1 <br /> PROJECT NAME:Zinc House Winery PROJECT LOCATION: 20679 Highway 120 Escalon, CA 95320 <br /> PROJECT NUMBER: G123.01 CLIENT: Latitude 37 Partners <br /> DATE EXCAVATED: 09/28/2019 GROUND ELEVATION:91 <br /> EXCAVATION CONTRACTOR:Lion River Construction GROUNDWATER:No aroundwater encountered <br /> EXCAVATION METHOD: CAT 303.5E2 SAMPLER TYPE: <br /> LOGGED BY: SP Bulk Sample Modified California <br /> NOTES: Elevation obtained from Gooale Earth Sampler <br /> _ ~o <br /> Z Z,J U Wo W CN <br /> p = W o a x <br /> �z Uui zcD <br /> MATERIAL DESCRIPTION w v N _ W o Ov <br /> -1v 0v Q Oa p W OZ <br /> W Jz Vlln <br /> Za <br /> m <br /> 91 0 10 <br /> SM SILTY SAND, brown, dry, very dense, fine-to medium- grained sand, <br /> ---- ------------------------------------------------------ <br /> SM/ SILTY SAND to SAND with SILT, medium to dark brown, moist, medium <br /> SP dense, fine-to medium- grained sand <br /> (Sample consolidated 0.1% upon loading to 2,000 psf and 5.2 <br /> consolidated additionally 3.5% after saturation) <br /> 86 5 <br /> Bottom of Test Pit at 51/z feet below ground surface. <br /> 1 10 1 <br /> 76 1 15 1 <br /> BAEZ GEOTECHNICAL GROUP A-1 <br />