My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_3Q13 QSSR QRSR QMR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1444
>
2900 - Site Mitigation Program
>
PR0527031
>
ARCHIVED REPORTS_3Q13 QSSR QRSR QMR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 1:52:18 PM
Creation date
3/4/2020 11:55:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
3Q13 QSSR QRSR QMR
RECORD_ID
PR0527031
PE
2957
FACILITY_ID
FA0018318
FACILITY_NAME
FORMER COLUMBO / TOSCANA BAKERY
STREET_NUMBER
1444
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503005
CURRENT_STATUS
01
SITE_LOCATION
1444 S LINCOLN ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
946
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L & M OPERABLE UNIT-THIRD QUARTER 2013 SITE STATUS, REMEDIAL SUMMARY, <br /> AND GROUNDWATER MONITORING REPORT <br /> Status of Remediation Activities <br /> November 1, 2013 <br /> 8.00 lbs. (1.29 gallons) of MTBE from soil vapor beneath the L&M OU. Historical SVE system <br /> operations and analytical data are presented in Table 19 through Table 22. <br /> 3.3 SEPARATE PHASE HYDROCARBON REMOVAL <br /> A free product removal system was installed at the Water Front Tower (WFT) property and <br /> became operational on September 11, 2013. Since startup the free product removal system <br /> has removed approximately 128 gallons of groundwater from the subsurface. A system <br /> startup report detailing the startup, operation and maintenance, and recovery status of the free <br /> product removal system will be submitted by Stantec in a stand-alone report. Free product <br /> removal skimmer system data can be found in Table 24. <br /> Due to the installation of the new free product removal system, quarterly SPH removal in the <br /> wells located offsite to the north on the WFT property was discontinued at the end of the first <br /> quarter of 2013. Approximately 1,802.3 gallons of SPH have been removed from groundwater <br /> beneath the Site since May 10, 2004. Historic SPH removal data can be found in Table 14 and <br /> Table 15. <br /> 3.4 CONCLUSIONS <br /> Based on review of system performance data, shutdown of the onsite remedial systems is <br /> warranted. Stantec has submitted a formal letter recommending shutdown of the onsite <br /> remediation systems. Pending approval from the RWQCB-CVR, Stantec will continue operation <br /> of the ASVE and SVE systems, and operation of the DPE system as field conditions warrant. <br /> 5tantec 3.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.