My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1426
>
2900 - Site Mitigation Program
>
PR0527611
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 1:58:18 PM
Creation date
3/4/2020 1:40:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527611
PE
2957
FACILITY_ID
FA0018709
FACILITY_NAME
FORMER DOLLY MADISON
STREET_NUMBER
1426
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503010
CURRENT_STATUS
01
SITE_LOCATION
1426 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Margaret Lagorio [EH] <br /> I <br /> From: Jim Barton Ubarton@waterboards.ca.gov] <br /> Sent: Tuesday, December.18, 2007 9:05 AM <br /> To: Margaret Lagorio[EH] <br /> Subject: Fwd: Re: Addendum to work plan; <br /> Attachments: RevW PAdd 12-13-07.pdf <br /> RevWPAdd12-13-0 <br /> 7.pdf(2 MB) <br /> Per your request. Thanks. <br /> >>> Jim Barton 12/13/2007 8 :35 AM >>> <br /> Thanks Scott. <br /> I reviewed the Workplan Addendum. The work .is necessary and appropriate, and approved as <br /> presented. Please acquire all necessary clearances and permits, and give the San Joaquin <br /> County Environmental Health Department and myself at least three working days notice prior <br /> to commencement of actual fieldwork, which is currently scheduled to begin 27 December <br /> 2007. If you need additional confirmation, a letter will follow next week. <br /> Jim <br /> James L.L. Barton, P.G. <br /> Engineering Geologist <br /> California Regional Water Quality Control Board Central Valley Region, 11020 Sun Center <br /> Drive, Suite 200, Rancho Cordova, CA 95670 office (916) 464-4615 <br /> fax (916) 464-4704 <br /> >>> "Scott Bittinger" <sbittinger@stratusinc.net> 12/13/2007 8:15 AM >>> <br /> B1ankJim: <br /> Attached is the work plan addendum we discussed a few days ago. The existing vapor <br /> extraction well (VW-1) is currently being used for quarterly sampling, as most of the <br /> screen length is submerged (only 4' of screen in the vadose zone) . This report proposes <br /> installing another vapor extraction well, within a few feet of VW-1, with a shallower <br /> screen interval, during this phase of drilling. <br /> You should be receiving a work plan to complete an SVE/AS pilot test, and an interim <br /> corrective action plan, in the next few weeks. <br /> Scott <br /> i <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.