My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1426
>
2900 - Site Mitigation Program
>
PR0527611
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 1:58:18 PM
Creation date
3/4/2020 1:40:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527611
PE
2957
FACILITY_ID
FA0018709
FACILITY_NAME
FORMER DOLLY MADISON
STREET_NUMBER
1426
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503010
CURRENT_STATUS
01
SITE_LOCATION
1426 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California regional Water Quality Cor`rol Board - <br /> Central Valley Region <br /> Karl E.Longley,ScD,P.E.,Chair <br /> Linda S.Adams'y for Arnold <br /> Secreta � 11020 Sun Center Drive#200,Rancho Cordova,California 9567(16114 <br /> Phone(916)464-3291 •FAX(916)464-4645 Schwarzenegger <br /> Environmental ���Z Governor <br /> Protection http://www.waterboards.ca.gov/centralvalley �� <br /> 24 November 2008 4111 l 20 <br /> 06 <br /> r. Travis Bryant <br /> 132Timothy n <br /> Van Buren St. I <br /> 0 S Interstate Brands Corporation <br /> Stockton, CA 95206 12 E. Armour Blvd. <br /> Kansas City, MO 64111 <br /> Ms. Lori Greene, c/o Richard L. Greene Mr. Jason Hunt <br /> Greene, Radovsky, Maloney, Share & Hennigh Temple Deliverance Church of God in Christ <br /> 4 Embarcadero Center - 40th Floor 3654 Iron Canyon Circle <br /> San Francisco, Ca94111 — — - Stockton, CA-95207 - <br /> DOCUMENT REVIEW, CLEANUP AND ABATEMENT ORDER (CAO) NO. R5-2007-0725, <br /> DOLLY MADISON/LANGENDORF BAKERY, 1426 S. LINCOLN STREET, STOCKTON, <br /> SAN JOAQUIN COUNTY, CALIFORNIA <br /> I reviewed the Final Remediation Plan (FRP), submitted 10 November 2008 by Mr. Kong's <br /> consultant Stratus Environmental, Inc. (Stratus). The FRP was submitted in response to <br /> CAO No. R5-2007-0725, Order#12, which states "Within 90 days of Regional Board staff <br /> concurrence with the proposed remedial action described in the Feasibility Study but no later <br /> than 1 November 2008, submit a Final Remedial Plan (FRP). The FRP must include a detailed <br /> description of the remedial actions to address cleanup of the entire groundwater plume and <br /> source area soils. The FRP shall also include a schedule to implement all remedial actions." <br /> Investigations to date show soil and shallow groundwater are impacted by the site underground <br /> storage tank (UST) gasoline release. In the third quarter of 2008, maximum groundwater <br /> concentrations were total petroleum hydrocarbons as gasoline (TPHg), 79,000 micrograms per <br /> Liter (ug/L); benzene, 620 ug/L; and methyl tert butyl ether (MTBE, upgradient monitoring well <br /> MW-7), 120 ug/L_ The FRP groundwater monitoring iso-concentration maps for first through <br /> third quarters of 2008 and geologic cross sections also provide evidence for a possible offsite <br /> source of the MTBE plume detected across the site and a deeper aquifer TPHg and benzene <br /> plume detected near MW-11. <br /> Soil vapor extraction (SVE) from soil at the UST area, air sparging (AS) in the shallow <br /> groundwater zone in and around the UST area, and natural attenuation for the dissolved MTBE <br /> and TPHg/benzene plumes in the mid-deep and deep groundwater zones are the three <br /> proposed FRP remedies. In order to expedite CAO compliance for the remediation phase, the <br /> remediation wells were proposed by the SVE/AS pilot study report recommendation/workplan, <br /> the workplan addendum provided final well locations that were approved by my 9 July 2008 <br /> letter, and the SVE/AS wells were installed prior to submittal of the FRP. The FRP includes the <br /> plans and specifications for the SVE/AS system with a schedule for installation of treatment <br /> system piping and equipment in January 2009, to comply with CAO Order #13, which states <br /> California Environmental Protection Agency <br /> �d Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.