My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013104
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
3780
>
3500 - Local Oversight Program
>
PR0545387
>
ARCHIVED REPORTS_XR0013104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 9:10:17 AM
Creation date
3/5/2020 8:30:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013104
RECORD_ID
PR0545387
PE
3528
FACILITY_ID
FA0005718
FACILITY_NAME
SINCLAIR TRUCKING
STREET_NUMBER
3780
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
3780 W LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cimlogicat recknics lac. 1 <br /> Page 5 <br /> Sinclair&Thompson Property <br /> Soil Gas Survey Report <br /> +r January 29,2007 <br /> In a letter dated March 15, 2006, Ms Duncan recapped the worked performed at the site and <br /> suggested the data be used to proceed with evaluation of the site for closure. After some <br /> discussion via email it was determined the site may need to be evaluated for risk from vapor <br /> Lo intrusion. In a letter dated May 17, 2006, Ms Duncan proposed the option of either <br /> requesting closure (if no further data was required) or conducting a soil gas survey to <br /> determine the risk of vapor intrusion. <br /> L. <br /> GTI submitted the Active Soil Gas Investigation Work Plan on August 18, 2006. Ms Duncan <br /> in a letter dated August 29, 2006 approved the work plan, with a minor modification. The <br /> budget was approved and permits obtained during the first part of the fourth quarter. The <br /> project was delayed twice due to rain, as the sampling event required at least three <br /> consecutive days of clear weather. <br /> The work proposed in the August 2006 Active Soil Gas Investigation Work Plan was <br /> performed on January 5, 2007. The following report documents the activities and analytical <br /> L. results of the soil gas survey. <br /> 3.0 SAMPLING ACTIVITIES AND RESULTS <br /> 3.1 Summary of Activities <br /> 3.1.1 Boring Clearance <br /> GTI obtained a Well Permit (SR# 48873) from the San Joaquin County Environmental <br /> v Health Department on November 13, 2006. The permit is included as Appendix A. <br /> ' The subsurface was cleared of utilities by marking the area with white paint and notifying <br /> Underground Services Alert (USA) of proposed work. No public utilities were found within <br /> 200 feet of the soil gas investigation area. The locations of the septic and liquid propane <br /> ' lines that service the residence were known and avoided. <br /> 3.1.2 Obstacles and Delays <br /> Weather was the largest obstacle to performing the scope of work outlined in the August <br /> Lo 2006 Active Soil Gas Investigation Work Plan. The investigation was postponed twice due to <br /> an active rain season. <br /> �. 3.2 Soil Gas Sampling and Analysis <br /> 3.2.1 Sampling Locations and Rationale <br /> �• Five locations were proposed for a soil gas investigation in an effort to determine the <br /> presence and concentration of gasoline related constituents in the vapor phase. An additional <br /> location was sampled to delineate the extent of the vapor phase constituents detected in SG-1. <br /> The soil gas survey locations (SG-1 thru SG-6) are shown on Figure 2. <br /> r. <br /> Lo <br />
The URL can be used to link to this page
Your browser does not support the video tag.