Laserfiche WebLink
Site Investigation Work Plan - <br /> - Country Market <br /> 10476 West Linne Road, Tracy, California a ntea g ro u p <br /> Antea Group Project No, CTRYMKT <br /> 5 .0 SCHEDULEAND REPORTING <br /> The site Responsible Party, Mr. John Muniz, Jr. informed Antea Group that funds to implement this workplan are <br /> not currently available. Antea Group will execute pre—field activities will begin upon approval of this work plan <br /> and receipt of client funding. Following receipt of boring permit approval, Antea Group will schedule a licensed <br /> driller to perform the work. Depending on weather and subsurface conditions, we anticipate the utility locate and <br /> advancement of the borings to take approximately two days. Standard laboratory turnaround time for soil <br /> samples is 14-days. <br /> Antea Group will review the analytical data and prepare a summary report within approximately two weeks of <br /> receipt of the analytical data from the laboratory. The summary report will contain the following: <br /> • A map depicting the final boring locations; <br /> • A description of drilling activities and boring logs; <br /> 7 • Laboratory data sheets and chain of custody documentation for soil samples, and a table summarizing <br /> 11 laboratory analytical results; <br /> • Waste disposal manifests; <br /> • Findings and conclusions of the field activities and laboratory data; <br /> • Recommendations for closure or future site assessment activities (if necessary). <br /> A California Registered Geologist will direct and supervise the proposed activities outlined in this work plan. Antea <br /> Group will prepare the reports in accordance with SJCEHD standards and will upload the reports, maps, and <br /> Janalytical data to the GeoTracker database per State of California requirements. _ <br /> it <br /> I <br /> 4 <br /> I � <br />