Laserfiche WebLink
0 0 = FALL CREEK <br /> ENGINEERING,INC. <br /> FCE will assess the influence of the irrigation well pumping on Monitoring Well 1 by <br /> monitoring water levels prior to and during an irrigation set. FCE proposes to complete <br /> this assessment in June. Based on the results of this assessment, FCE will determine if a <br /> second well is needed. Therefore, FCE proposes to install the monitoring well(s) in July <br /> 2003, rather than June 2003, as previously discussed in the original work plan, dated 7 <br /> April 2003. <br /> If you have any questions, comments or require any additional information, please do not <br /> hesitate to contact me at (83 1) 426-9054. <br /> 4Sinc rely, <br /> •Y�,ter <br /> PE ER HAASE, P.E. <br /> Principal Engineer <br /> cc: Alice Gonzales, Alpine Packing Company <br /> Mike Huggins, SJCEHD, Stockton <br /> 2 <br />