Laserfiche WebLink
Geosyntec <br /> TABLE OF CONTENTS <br /> 1. INTRODUCTION....................................................................................................................1 <br /> 1.1 Document Organization ..................................................................................................1 <br /> 2. BACKGROUND......................................................................................................................2 <br /> 2.1 Project Background.........................................................................................................2 <br /> 2.2 Project Description..........................................................................................................2 <br /> 2.3 Geology and Hydrogeology ............................................................................................3 <br /> 3. FIELD INVESTIGATION.......................................................................................................4 <br /> 3.1 Pre-Field Activities..........................................................................................................4 <br /> 3.2 Field Investigation and Sampling Methods.....................................................................4 <br /> 3.3 Post-Sampling Activities.................................................................................................5 <br /> 3.4 Cuttings Disposal and Decontamination.........................................................................6 <br /> 4. REPORTING............................................................................................................................7 <br /> 5. ANTICIPATED SCHEDULE..................................................................................................8 <br /> 6. REFERENCES.........................................................................................................................9 <br /> LIST OF TABLES <br /> Table 1: Sample Testing Matrix <br /> LIST OF FIGURES <br /> Figure l: Site Location <br /> Figure 2: Site Well Network <br /> Figure 3: Aeration System Location Map and Proposed Boring Locations <br /> Pre-Design Data Collection Work Plan ii July 22,2019 <br />