Laserfiche WebLink
4e <br /> Mr. Harlin Knoll, SJCEHD April 7,2006 <br /> Work Plan for Confirmation Soil Borings Project No.2007-0065-01 <br /> USA Station No. 65, Lodi,Califomia <br /> Page 7 <br /> Task 4: Report Preparation <br /> After completing the field activities and receiving the laboratory results, Stratus will <br /> prepare a report documenting the activities completed. The report will include, but not <br /> limited to, soil boring logs, tabulated analytical results, a scaled site plan, and certified <br /> analytical reports. <br /> SCHEDULE <br /> Following approval of this Work Plan, a C-57 licensed drilling contractor and a C-57 <br /> licensed CPT contractor will be retained and the work will be scheduled. Approximately 3 <br /> to 5 weeks will likely be necessary for the licensed contractors to become available. The <br /> report documenting work activities will be submitted within approximately 6 weeks of <br /> receiving all analytical results. <br /> If you have any questions or comments concerning this Work Plan, please contact Gowri <br /> Kowtha at (530) 676-6001. <br /> Sincerely, <br /> OTRATUS ENVIKONMENT �oVgOFESSiO, <br /> � <br /> f. m <br /> W C.634;3 <br /> hen J.Carter E*1 C11 hLp <br /> Scott Bittinger, P. No. 5577 0 . Kowtha, P.E. cl& <br /> Project Geologist (P ��� roject Manager OCN�f"' <br /> Attachments: Table 1 O and Well Construction Summary <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Soil Concentration Summary Map (Dispenser Islands) <br /> Figure 4 Soil Concentration Summary Map (UST Pit and Soil <br /> Borings) <br /> Figure 5 Groundwater Analytical Summary, First Quarter 2006 <br /> Appendix A Field Practices and Procedures <br /> CC' Mr. Charles Miller, USA Gasoline Corporation <br /> Mr. James Barton, Regional Water Quality Control Board <br /> Mr. Louis Orlando, AKT Development <br /> KAUSA Gasoline\0065\Workplans\usa65-boring-cpt-workplan,doc 0MATUS <br />