My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 4:58:04 PM
Creation date
3/5/2020 4:22:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V f <br /> The samples will be collected in 2-inch by 6-inch brass sleeves using a drive sampler. The <br /> samples will then be sealed with duct tape, labeled with sample ID number, depth, time <br /> taken, sampler, and stored in a cooler at 4°Centigrade. The samples will be delivered to a <br /> California State licensed laboratory under standard chain-of-custody procedures to be <br /> analyzed for total petroleum hydrocarbons in the gasoline range (TPH G; EPA Method <br /> 8015 Modified), benzene, toluene, ethylbenzene, and xylenes (BTEX; EPA Method 8020), <br /> respectively. The sampling equipment will be cleaned with a trisodium phosphate (TSP) <br /> solution between soil samples. <br /> 2. To mitigate impacted soil, if found, during station upgrade operations and UST removal <br /> operations, over-excavation of the UST field may be needed. This workplan purposes to <br /> remove up to approximately 200 cubic yards of soil from the bottom of the UST <br /> excavation. This corresponds to approximately 6-feet of soil to be removed from the base <br /> of the UST field. Excavated soil will be stockpiled on-site and profiled with the other <br /> excavated soil from the UST and fuel distribution line upgrade activities for appropriate <br /> disposal. All work will be conducted under the direction of USA's construction crew. <br /> The existing permits and access agreements will be used for this additional excavation <br /> work. <br /> Soil samples will be collected at the direction of PHS/EHD. The samples will be analyzed <br /> for TPH G, BTEX and methyl-tert-butyl-ether(MTBE; EPA Method 8020). Selected soil <br /> samples from the stockpiles will be analyzed for total lead (EPA Method 60 10) for <br /> disposal. <br /> A Site Safety Plan is included in Appendix A. To document the efforts from implementing this <br /> workplan, a report of findings will be prepared and provided. <br /> Mr. Srikanth Dasappa with USA retained GHH Engineering, Inc. to prepare this workplan. <br /> When implemented, the work will be conducted in a manner consistent with the level of care and <br /> skill ordinarily exercised by members of our profession currently practicing under similar <br /> conditions in the State of California and the City of Lodi. <br /> If you have any questions or need additional information,please call the undersigned at(916) <br /> 723-7645. <br /> Thank you, <br /> Vern A. Bennett <br /> Project Manager <br /> Richard . ip , G., H.G. <br /> Principal Hydrogeologist <br /> F:\5059.02\VB\naj\Exc.wp <br /> PC: Mr. Harlan Knoll, San Joaquin County PHS/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.