Laserfiche WebLink
�f <br />' REMEDIAL ACTION PLAN <br /> USA STATION#65 - LODI <br /> NOVEMBER, 1995 <br /> 11.3 Closure Report Preparation <br /> A Site Closure Report will be prepared and submitted to the County,following the completion of <br /> soil and groundwater remediation and sampling�activities at the site. This final report will include <br /> a summary of all remedial activities conducted at the site, the treatment methodologies used, and <br /> an evaluation and interpretation of data gathered during remedial activities, and the technical <br /> 4 rationale for the conclusions and recommendation_s reached. <br /> 12.0 CONDITIONS AND EXCEPTIONS <br /> 01 <br /> This RAP represents Park's professional opinions and recommendations and was prepared based <br /> on currently available data in accordance with normally accepted practices. The RAP is subject to <br /> review and'approval by the County. Changes in,the RAP maybe necessary due to the results of <br /> further assessments at the site and/or a further evaluation of remedial options. <br /> 13.0 SIGNATURES <br /> Q'�'OFESS/C? <br /> This RAP was prZTAL <br /> S <br /> P RK ENVI ONMPORATION � o C09550� <br /> Exp. <br /> 'i civil_ <br /> Jeffrey S. Patton, P.E, qac OF C&AW ate <br /> Senior Engineer <br /> This RNP was reviewed by: <br /> Richard ipp, R.G. Date <br /> Principal Hydrogeologist <br /> F:`5059\1FNna1*\l 195\rap <br /> 13 <br />