My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003917
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
ARCHIVED REPORTS_XR0003917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 5:49:46 PM
Creation date
3/5/2020 4:52:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003917
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of some component required for microbial activity such as oxygen for aerobic <br /> k <br /> bioremediation. <br /> Approximate Cost and Time Frame,. The approximate cost to implement bioremediation <br /> ranges from $10,000 to $100,000 depending on type of monitoring and reporting. The <br /> duration of bioremediation activities may range from 7 to 10 years. <br /> 3.2.4 Containment <br /> Advantages. The installation of a containment system is an effective way to contain the <br /> spread of the contaminates in the groundwater. It is accomplished in a relatively short <br /> period of time, and requires no maintenance. <br /> Disadvantages. Containment at depth is hard to accomplish without using very expensive <br /> installation equipment. For compounds that migrate vertically through the groundwater, <br /> the containment is contingent upon the presence of an impermeable layer at the depth of <br /> the water bearing zone being scaled. <br /> Approximate Cost and Time Frame. The approximate cost to implement containment <br /> includes installation, and monitoring may range from $300,000 to $500,000 depending on <br /> depth of the installation. <br /> 3.3 Selection of Remedial Alternatives <br /> Based on the known extent of the impact to groundwater, it is recommended that a soil <br /> vapor extraction and air sparge system be installed to remove impacted vadose zone soil <br /> and groundwater on the site and prevent the migration of petroleum hydrocarbons from <br /> the site. <br /> 3-4 <br /> ESJ:IE:\USA100651REPORTS\0065P201.DOC-98usg:1 Rev.0,1/26/99 <br /> 20A41-007.001 <br /> I, <br />
The URL can be used to link to this page
Your browser does not support the video tag.