Laserfiche WebLink
construct permit from SJVAPCD. The following items need to be accomplished in order <br /> to meet the June 25, 1999 timeline for installation- <br /> 1. SJCPHD acceptance of proposed system by February 15, 1998 <br /> 2, Installation of AS-1 <br /> => Pilot Test <br /> 3. Finalize design <br /> 4. Planning department review <br /> 5. Permitting <br /> => San Joaquin, City of Lodi <br /> Building <br /> => Electrical <br /> SJVAPCD <br /> => ATC/PTO Permit <br /> b. Contractor Bidding <br /> 7. Equipment Lead time <br /> =::.-, Catalytic oxidizer <br /> => Piping <br /> 8. Construction Inspections <br /> 9. Start-up and troubleshooting <br /> 4-3 <br /> E5JAEAUSA100651RPPORM0065P201.DOC-9$usg:I Rev.0,1/26/99 <br /> 20A41-007.001 <br /> t <br />