Laserfiche WebLink
I� <br /> F1 , 5 �` , <br /> ary February March April <br /> ID Task Name Duration Start Finish 1/17 1 1/24 1/31 1 2/7 2/14 2/21 2/28 3/7 J 3114 1 3/21 1 3/28 414 4111 <br /> 1 SVETS Implementation 154d Wed 1120/99 Mon 8123199 <br /> 2 Submittal of RAP 1d Wed 1/20/99 Wed 1/20/99 1120 <br /> 3 SJPHD Acceptance of Proposed System* id Mon 2/22199 Mon 2/22/99 2122 <br /> 4 Installation of air sparge wells 5d Mon 3/22/99 Fri 3/26/99 <br /> 5 Pilot Test 5d Mon 3/29/99 Fri 4/2/99 <br /> 6 Finalize Design 5d Mon 5/17/99 Fri 5/21199 <br /> 7 Planning Department Review 7d Mon 5/24/99 Tue 6/1/99 <br /> 8 Permitting* 11d Wed 6/2/99 Wed 6/16/99 <br /> 9 Building Approval 6d Wed 6/2/99 Wed 6/9/99 <br /> 10 Electrical Approval 5d Thu 6/10/99 Wed 6116199 <br /> 11 SCVAPCD ATC/PTO* 90d Tue 2/23/99 Mon 6/28/99 <br /> 12 Retain Contractor 10d Fri 5/21/99 Thu 6/3/99 <br /> I <br /> 13 Equipment Lead Time 30d Thu 6/3/99 Wed 7/14/99 <br /> 14 Catalytic oxidizer 30d Thu 6/3/99 Wed 7/14/99 <br /> 15 Air sparge blower 30d Thu 6/3/99 Wed 7/14/99 <br /> 16 Piping 1 d Thu 6/3/99 Thu 6/3/99 <br /> 17 Construction 15d Thu 7/15/99 Wed 8/4/99 <br /> 18 Construction Inspections 13d Wed 8/4/99 Fri 8/20/99 <br /> 26 Start-up&Troubleshooting 1d Mon 8/23/99 Mon 8/23/99 <br /> I <br /> Task Rolled Up Task <br /> Project: USA Petroleum Corporation Station No.65 Progress Rolled Up Milestone O <br /> 2500 West Lodi Avenue <br /> Lodi,California Milestone . Rolled Up Progress <br /> Summary <br /> f Denotes Critical Path Item 1 <br />