Laserfiche WebLink
HO 5 <br /> May i ,tune July August <br /> ID Task Name 4/18 4/25 512 5/9 5116 5/23 5130 6/6 6/13 6/20 6/27 7/4 7111 1 7118 7/25 811 818 Blt5 8/22 <br /> 1 SVETS Implementation <br /> 2 Submittal of RAP <br /> 3 SJPHD Acceptance of Proposed System <br /> 4 Installation of air sparge wells <br /> 5 Pilot Test <br /> 6 Finalize Design <br /> 7 Planning Department Review <br /> 8 Permitting <br /> 9 Building Approval <br /> 10 Electrical Approval <br /> 11 SCVAPCD ATC/PTO* <br /> 12 Retain Contractor <br /> 13 Equipment Lead Time <br /> 14 Catalytic oxidizer <br /> 1s Air sparge blower <br /> i <br /> 16 Piping <br /> 17 Construction <br /> 18 Construction inspections <br /> 26 Start up&Troubleshooting 812 <br /> I <br /> Task Rolled Up Task <br /> Project: USA Petroleum Corporation Station No.65 Progress Rolled Up Milestone O <br /> 2500 West Lodi Avenue <br /> Lodi,California Milestone Rolled Up Progress <br /> 1 <br /> Summary �� <br /> *Denotes Critical Path Item 2 <br />