My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003917
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
ARCHIVED REPORTS_XR0003917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 5:49:46 PM
Creation date
3/5/2020 4:52:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003917
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 SITE DESCRIPTION <br /> The subject site is located in the city of Lodi, California at 2500 West Lodi Avenue (see <br /> Figure 1). The site consists of a retail gasoline station and carwash. Three underground <br /> storage tanks (USTs) and three dispenser islands are present. To the west and south, the <br /> site is flanked by a shopping center/parking area. In addition, the site is bordered by <br /> West Lodi Avenue to the north and South Main Canal and Lower Sacramento Road to the <br /> east. The site location is shown on Figure 1, <br /> In 1997, three 12,000 gallon underground storage tanks (UST's) and three fuel dispensing <br /> islands were removed and replaced at the site. The tanks and dispensers contain regular, <br /> plus, premium grade unleaded, and diesel gasolines. The surface elevation of the site is <br /> approximately 37 to 38 feet above mean sea level (MSL). The layout of the subject site is <br /> presented in Figure 2. <br /> 2.1 Site Background <br /> As published by GHH Engineering, INC. in their third quarter groundwater monitoring <br /> report titled; Third Quarter, 1998 Groundwater Monitorin2 Report site background is as <br /> follows. <br /> A limited site investigation completed in March, 1987 detected petroleum,hydrocarbon <br /> compounds in the soil and groundwater beneath the site. The investigation included the <br /> drilling and sampling of four soil borings, two of which were completed as groundwater <br /> monitoring wells (S-1 and S-2). <br /> In August, 1987, Applied Geosystems installed three additional groundwater monitoring <br /> wells (MW-1, MW-2, and MW-3). USA requested that Applied Geosystems complete <br /> four additional monitoring wells (MW-4, MW-5, MW-6, and MW-7) in the downgradient <br /> direction to further define the lateral extent of the impacted groundwater. Applied <br /> Geosystems then prepared a Problem Assessment Report (PAR) after completing <br /> monitoring wells MW-6 and MW-7. The PAR concluded that petroleum hydrocarbons <br /> impacted water had migrated beyond the property boundaries, and that the groundwater <br /> in the upper aquifer; above 42 feet below ground surface (bgs), was not in hydraulic <br /> continuity with the deeper aquifers. It was their opinion that further delineation of the <br /> impacted soil and water was not required. <br /> ESJ:\E:\USA\00651REPORTS\0065P201.DOC-98\Isg:1 Rev.0, 1/26/99 <br /> 20A41-007.001 2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.