My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012557
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
ARCHIVED REPORTS_XR0012557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 7:04:42 PM
Creation date
3/5/2020 5:03:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012557
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ .x. � yi g _ �• t <br /> Problem Assessment Report December 5, 1989 <br /> USA Petroleum Station No. 65, Lodi, California AGS 87050-3 <br /> 4 <br /> FIELD WORK AND METHODS <br /> The field work performed in this investigation that has not been previously reported <br /> included: 1) drilling four soil borings offsite,2)collecting soil samples and classifying them <br /> according to the Unified Soil Classification System, 3) installing four ground-water <br /> monitoring wells in the borings, 4)sampling ground water from the seven monitoring wells <br /> i at the site, 5) surveying the elevations of the wells by a licensed surveyor, 6) performing <br /> i <br /> bailer tests to obtain preliminary estimate of transmissivity and hydraulic conductivity of the <br /> aquifer, 7).,&valuating the groundwater flow direction at the time of sampling, and 8) s _ <br /> evaluating the zero line of contamination. ; <br /> Ground-water monitoring well MW-4 was drilled and installed on January 17, 1989; well <br /> MW-5 was drilled and installed on January 18, 1989. At the request of USA, permits were <br /> obtained for two additional wells to further delineate the limits of ground-water <br /> contamination. Well MW-6 was drilled and installed on February 23, 1989, and well MW-. <br /> N <br /> 7 was drilled and installed on March 28, 1989, <br /> Y � <br /> 'fhe location of the four offsite borings and monitoring wells in relation to adjacent property <br /> , <br /> i are depicted on Plate P-2. The placement of. the wells was''based on the previous <br /> ----- <br /> - evaluation of the groundwater gradient across the site. Borings were drilled to 20 feet <br /> ;A <br /> s �, <br /> MIN=IN ills <br />
The URL can be used to link to this page
Your browser does not support the video tag.