My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012557
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
ARCHIVED REPORTS_XR0012557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 7:04:42 PM
Creation date
3/5/2020 5:03:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012557
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a c <br /> Problem Assessment Report llcc^tuber 5, 1989 <br /> USA Petroleum Station No. 65, Lodi, California <br /> AGS 87050-3 <br /> below the groundwater level or into a competent aquiterd and converted into ground- <br /> wafer monitoring wells. <br /> afet l'la <br /> Field work was performed at the site by Applied GeoSystems on behalf,of USA in <br /> i <br /> l accordance with Applied GeoSystems' Site Safety Plan No. $7050-35 (January 11. I989). <br /> e <br /> This plan describes the basicsafety requirements for the drilling project at the work site. <br /> The site safety plan is applicable to personnel of Applied GeoSystems and to our <br /> subcontractors. Personnel scheduled to work at the site were briefed on the contents of the <br /> t site safety plan before work began. A copy was kept at the work site and was available for <br /> F reference by appropriate parties at all times. Our staff geologist was the Site Safety Officer. r <br /> D ! 01 ectin and am !in Procedures for oil Sam les <br /> �F <br /> Prior to drilling, we contacted Underground Service Alert to delineate public utility lines <br /> I <br /> W at the site. We also hand-augered the borings to a depth of approximately S feet below <br /> grade to attempt to locate underground structures. <br /> r� <br /> In each drilling event, the soil borings were drilled using a Mobile'CME-55 drilling.rig <br /> rr equipped with 8-inch-diameter, continuous flight, hollow-stem augers. The drill rig was <br /> - <br /> 16 i <br /> z <br /> Stems <br /> f <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.