10 November 2006 <br /> -AGE-NC Project No. 01-0815 <br /> Page 3 of.5. <br /> mean sea level. Procedures for well installation,develo meat and-survey are presented in Sections <br /> 3.2.,and 3..3., respectively. <br /> 2.4. GROUND WATER SAMPLING-AND ANALYSIS <br /> The new well will be added to the existing monitoring welf network. Ground water monitoring and. , <br /> sampling will be conducted each quarter, and will inc ude recording depth to ground water and. . <br /> collection,of ground water samples for-laboratory-anal ysis by a DHS-certified laboratory for the <br /> analytes noted in Section 2.2.Ground water sample colle tion protocols are described in Section 3.4. <br /> Laboratory reports for ground water analyses,-testing in thods, laboratory quality assurance/quality <br /> control(QA/QC)reports,and sample chain of custody d cementation will be presented in quarterly <br /> reports with findings and recommendations. .. <br /> .,2.5: PREPARATION OF REPORT OF FINDINGS <br /> Following well installation and sampling activities,a report will be prepared'preseriting the findings. -" <br /> The report will include a description of work performed and the'results of the soil and ground water = <br /> sampling and analysis. Laboratory reports for ground water analyses, testing methods, laboratory <br /> quality assurance/quality control(QA/QC).reports;and s ample chain of custody,documentation will <br /> be presented in the report. Conclusion's and recommendations will also-be included, if applicable. <br /> The report will be in a format acceptable.to the CVRW CB, and will be reviewed and signed by.a <br /> California Professional Geologist.(PG). <br /> 3.0. FIELD PROCEDURES <br /> All field procedures will be overseen by an AGE te'Vresei itative under the supervision of a California - <br /> Professional Geologist. Procedures for the well installation,_well development, sampling are <br /> 'described below. <br /> 3.1. PILOT SOIL BORING <br /> Two pilot soil borings will be advanced on the site, on to a'm'aximum.depth of 150 feet bsg, and. <br /> one to a depth of 130; feet bsg or greater, utilizing a truck-mo uneTiolrow_stein drill rig with <br /> 8.25-inch dlalrieter ollow-stem augers to install group water monitoring wells. SoI samples will = . <br /> be collccted from one soil boring(B-2) at five-foot inte als, beginning at five feet bsg. Relatively <br /> Advanced GeoEnvironmental,-Inc. <br />