My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2850
>
3500 - Local Oversight Program
>
PR0545426
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 11:17:16 AM
Creation date
3/6/2020 10:38:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545426
PE
3528
FACILITY_ID
FA0003857
FACILITY_NAME
DIAMOND TRANSPORTATION LOGISTIC INC
STREET_NUMBER
2850
Direction
E
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17910003
CURRENT_STATUS
02
SITE_LOCATION
2850 E LOOMIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 November 2006 <br /> AGE-NC Project No. 01-0815 <br /> Page 4of5. <br /> :undisturbed soil samples will be collected in the boringJL2,psing a California modified split-spoon <br /> sampler fitted with 2-inch diameter, 6-inch long brass sl eves.Upon removal from the sampler,the <br /> sample sleeves will be separated with Anife.The expos 'd ends of the second sleeve will be covered.' <br /> With Teflon sheets, capped and sealed with tape. Soi s sampled in the boring will be visually <br /> classified by an-AGE geologist in accordance'with the t nified Soil Classification System.(USCS). <br /> Additionally, soil samples will be field screened fort e.presence of volatile organic compounds, <br /> using an organic vapor meter(OVM),'_equipped with aphoto ionization detector(PID). Soil sample <br /> descriptions and-OVM.readings will.be recorded on a log for-each boring. <br /> -Following sample collection,each preserved sample sleeve will be labeled with the boring location, . . <br /> depth,time,date;and sampler's initials.Appropriately sealed and labeled samples will be placed in <br /> a chilled container under ice and transported under cba n-of-custody procedure to.a DHS-certified <br /> laboratory. <br /> 3.2.. WELL COMPLETION AND WELL ELEVATION.SURVEY <br /> The 8.25-inch diameter pilot boring MW-6 will be single-completed as groundwater monitoring <br /> well utilizing 2-inch diameter schedule 40 polyvinylchl ride (PVC)0.010-inch slotted well screen. <br /> and blank well casing.A 5-foot len th of well screen i ticipated for installation of the monitoring <br /> Well placed for lateral coition,based on the construc ion of existing on-site monitoring wells. A <br /> . proposed monitoring well construction diagram is.depi ted in Figure 3: <br /> After installing the well casing_in the pilot boring, a fi ter pack material consisting of pre-washed <br /> #3 sand will be added through the augers over the screen interval to approximately two feet above <br /> the screened interval. Following placement of the filter pack,,the well will be surged and purged to' <br /> assist in settling'the filter pack. Additional sand will be added if settling occurs. <br /> A nominal two-foot bentonite seal(pell plug non-code( bentonite pellets)will be placed.above the <br /> filter pack to minimize the potential,for grout penetration into the screened section of the well. The <br /> bentonite seal will be formed by pouring bentonite pellets into the annulus and allowing them to' .. <br /> settle on the,filter pack. The bentonite pellets will be all Dwed to hydrate for a minimum of one-half <br /> hour prior to grouting: <br /> The remaining annular space in MW-6 will be filled within one foot of the ground surface with a <br /> cement grout- boring B-2 will be backfilled to-surface grade with-cement grout. The grout mixture <br /> will consist of Type I/ll.portland neat•ceinent and not more than 6 gallons of water per-94-pound <br /> sack of cement. The grout will be placed by pumping tf Lrough tremmie pipe. A grouting inspection <br /> will be scheduled with EHD personnel. ' <br /> Advancer!GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.