Laserfiche WebLink
10 November 2006 <br /> AGE-NC Project No: 01-0815 <br /> Page 5 of 5 .. <br /> Following-conipletion of the monitoring wells;well elevations and locations will be surveyed by a <br /> California-licensed surveyor relative to a City of Stock on elevation benchmark. <br /> 3.3.- WELL-DEVELOPMENT <br /> Development of the proposed well will consist ofa-co bination of bailing with a stainless steel <br /> bailer to remove the major portion of fine-graine'd-sedirneht from inside the well, surging to flush <br /> out or draw in sediment from the filter pack and additional ground water evacuation(purging)with <br /> a Waterra bailing pump to finish the removal of fine7'agrained sediment. Developmental purging <br /> activities will be continued until field parameter (pH electrical conductivity, and temperature) <br /> readings have stabilized and purged water,is visually s ,diment-free. <br /> 3A. 'GROUNDWATER SAMPLING PROCEDU S'. <br /> Water samples will be collected from-the monitoring well using a disposable polyethylene bailer or <br /> a dedicated teflon tubing used in conjunction with the inertia pump.The bailers are disposed of after <br /> one use and require no decontaminating and-the teflon ubing used-with the inertia pump is either <br /> dedicated to each well or changed at each sampling eve t, thereby minimizing cross contamination <br /> due to sampling devices. Samples will be drawn and cc llected in such'a manner that agitation and <br /> exposure of the groundwater to the atmosphere is minimal <br /> Ground water-samples will be collected into.laboratory' upplied containers. Ground water samples <br /> and three 40-m1 volatile or_amc an sis VOA ,Vials without preservative. Following-liter amber bottle . <br /> to be analyzed for TPH-g,'TPH=d,BTEX,and MTBE will be collected into one 1-lit ...,.•..,, <br /> g _Y (�--_) p wing collection, <br /> the samples will be placed,on ice and-kept in a cooler witil delivered to the laboratory for.ahalysis <br /> Chain-of=custody protocols will.be used to document sample custody transfer from the field to the. <br /> analytical.laboratory. A chain-of-custody form will acc. mpany the samples. <br /> 3.5: EQUIPMENT DECONTAmINATIONIWAST MANAGEMENT. <br /> All sampling tools used for sample collection will be thoroughly rinsed with clean water after being <br /> washed with a solution ofAlconox.All down-hole.drilli ig,equipment will be pressure washed prior <br /> to starting each boring:Cuttings generated during drilling and rinseate generated during drilling and <br /> groundwater sampling activities will be containerized irk properly labeled DOT-approved 55-gallon <br /> drums, and.stored on-site in an area lacking public access. Disposal alternatives will be evaluated <br /> basedon results of soil and water analysis.' <br /> AdvangW GeoEnvironmental,Inc. <br />