My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REPORT SUMMARIZING INSTALL OF MONITORING WELLS MW4,MW5,MW7,MW8 & SOIL BORING RDM1 & 4TH QTR 2013 GROUNDWATER SAMPLING
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3138
>
2900 - Site Mitigation Program
>
PR0536580
>
ARCHIVED REPORTS_REPORT SUMMARIZING INSTALL OF MONITORING WELLS MW4,MW5,MW7,MW8 & SOIL BORING RDM1 & 4TH QTR 2013 GROUNDWATER SAMPLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 9:59:30 PM
Creation date
3/9/2020 9:43:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REPORT SUMMARIZING INSTALL OF MONITORING WELLS MW4,MW5,MW7,MW8 & SOIL BORING RDM1 & 4TH QTR 2013 GROUNDWATER SAMPLING
RECORD_ID
PR0536580
PE
2960
FACILITY_ID
FA0021000
FACILITY_NAME
HUNTBROOK HOLDINGS
STREET_NUMBER
3138
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15710403
CURRENT_STATUS
01
SITE_LOCATION
3138 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E.G.64M1 JR. <br /> •G, a aa,• � �4rTR1EA Rnmquez <br /> Water Boards <br /> r�R <br /> exvwRacru vrors� <br /> Central Valley Regional Water Quality Control Board <br /> 22 May 2013 <br /> Angela Lee <br /> Huntbrook Holdings, LLC <br /> 2351 Sunset Blvd., #170-717 <br /> Rocklin, CA 95765 <br /> • <br /> STAFF LETTER REVIEW AND RESPONSE, E&R FREEMAN, 3138 E. MAIN STREET, <br /> STOCKTON, SAN JOAQUIN COUNTY(CASE 390328) <br /> On 1 May 2013, 1 reviewed a copy of the cost pre-approval letter (Letter) that Huntbrook <br /> • Holdings, LLC received from the State Water Resources Control Board (SWRCB), Technical <br /> Review Unit of the Underground Storage Tank Cleanup Fund (Fund). The Letter acknowledged <br /> that the Regional Board (staff) had approved the scope of work covered in the Letter pre- <br /> approval; however, there were several inaccurate statements in the Letter that resulted in no <br /> funding for specific tasks, namely under Task 9 Remedial Testing Activities; Task 10 Remedial <br /> • Testing Results Report, and Task 11 Corrective Action Plan/system Design. The Letter <br /> Comment(s) section for each of the tasks state "The site needs to be evaluation (sic) under the <br /> Low Threat Closure Policy prior to initiating remediation efforts." I completed/finalized the Low <br /> Threat Closure Policy (LTCP) Checklist on the SWRCB GeoTracker website for your case on <br /> 27 March 2013, which is/was available for review by Fund staff, more than 30 days prior to the <br /> • date of the Letter. I concluded for multiple reasons, also stated in my letter dated <br /> 13 February 2013, that your case does not pass the LTCP. My letter on GeoTracker also stated <br /> that an additional soil and groundwater investigation was necessary to complete the offsite <br /> investigation, and approved a pilot study, which is necessary to demonstrate that the proposed <br /> remedial action at the dispenser island source area would be effective at full scale, if warranted <br /> • by the data. <br /> In order to provide the Fund with additional assurance that there is sufficient contamination in <br /> soil and groundwater to warrant the above pilot study, the soil investigation of the dispenser <br /> island source area under the building-covered former dispenser area that was a part of the pilot <br /> study is now split off as a separate phase of the investigation, to be completed prior to the Pilot <br /> • Study and supply additional information to Fund staff. Data from the investigation will then be <br /> used to support the funding for the Pilot Study. This phasing does not constitute a change in the <br /> scope of work, to investigate and remediate soil and groundwater as necessary. Had the scope <br /> of work changed, that action would have resulted in another technical review for pre-approval <br /> per the Letter. <br /> • <br /> Furthermore, the Regional Water Quality Control Board is currently the lead agency for directing <br /> and approving all regulatory and technical aspects of the USTs case. All Regional Board staff <br /> K, E. LoRai ScC, P.E.,Gw I P�E"C. GR P.E.,SCEE,oa3umvE GR ER <br /> 11 ata Sun Cn GrM MO.Rancho Cardo CA 8WM I w .G Wbearda.oa.acWoeRvalrallq <br /> • <br /> RGGN[lG0 MPGR <br />
The URL can be used to link to this page
Your browser does not support the video tag.