Laserfiche WebLink
, z <br /> v5 2 -�® �a <br /> San Joaquin County DIRECTOR P <br /> Au' Environmental Health Department Donna Heran,REHS <br /> n <br /> M ASSISTANT DIRECTOR <br /> r. s 600 East Main Street Laurie Cotulla,REHS <br /> U1. < Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Carl Borgman,REHS <br /> Website:www.SJgov.or ehd Mike Huggins,REHS,RDI <br /> c4 L b aN�P Margaret Lagorlo,REHS <br /> Phone: (209)468-3420 Robert McClellon,REHS <br /> Fax: (209)464-0138 Jeff Carruesco,REHS,RDI <br /> Kasey Foley,REHS <br /> March 23,2009 <br /> John and Margaret Marci <br /> 20 Mobile Lane <br /> Crescent City,California 95531-8409 <br /> Subject: John and Margaret Marci Property <br /> 2969 Loomis Road <br /> Stockton,California 95205 <br /> The San Joaquin County Environmental Health Department (EHD) has reviewed Revised Work <br /> Plan - Additional Dual Phase Extraction Pilot Test, (revised work plan) dated January 23, 2009, <br /> prepared by Geological Technics Inc. (GTI) on your behalf. The revised work plan was submitted <br /> in response to the EHD letter dated December 31, 2008,recommending several modifications to the <br /> original work plan involving dual phase extraction(DPE). <br /> In the revised work plan, GTI proposes to install three additional extraction wells (EW-4, EW-5, <br /> and EW-6) at locations illustrated on Figure 2. The proposed extraction wells will be used to <br /> conduct three DPE pilot tests using high vacuum technology to simultaneously extract groundwater <br /> and soil vapor. GTI proposes the DPE tests to last five days at each proposed extraction well with <br /> nine-day breaks between tests to allow equilibrium conditions to be reestablished. During each <br /> pilot test, GTI proposes to collect three gas and three groundwater samples to be analyzed for <br /> benzene, toluene, ethyl benzene, and total'xylenes (BTEX); total petroleum hydrocarbons <br /> quantified as gasoline MH-G), and total petroleum hydrocarbons quantified as diesel (TPH-D). <br /> GTI proposes to monitor vacuum influence, volatile organic compound concentrations using a <br /> photo ionization detector(PID), and depth to groundwater in observation wells MW-4,MW-5,and <br /> MW-7 for all three pilot tests. Other wells to be monitored during one or more pilot tests include <br /> injection wells IW-1, IW-101 and extraction wells EW-1, EW-101, EW-2, EW-102, EW-3 and <br /> EW-103. <br /> The EHD approves the installation of proposed dual phase extraction wells EW-4, EW-5, and soil <br /> vapor extraction well EW-6. All three wells will be constructed using ten-inch diameter augers and <br /> four-inch diameter casings. EW-4 will be screened between forty-five and seventy feet below <br /> surface grade (bsg); EW-5 will be screened between thirty and fifty feet bsg; and EW-6 will be <br /> screened between ten and thirty-five feet bsg. The EHD recommends the annular seal be <br /> approximately three feet for each well instead of the proposed ten feet for EW-4 and eight feet <br /> proposed for EW-5. Also, soil and groundwater generated during drilling must be analyzed for <br /> chemicals of concern, and contained in properly labeled•Department-of-Transportation-approved <br /> fifty-five gallon drums,and stored on site until proper disposal. _ <br /> 3 3 N, A-C Y n-6.g b s a^^-.��G S -�- I vJ q�e Y <br />