My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 7:55:35 PM
Creation date
3/9/2020 9:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i A <br /> Ceologcca1 Techlucs lac. <br /> 1172 Kansas Avenue <br /> Modesto,California 95351 <br /> (209)522-4119/Fax(209)522-4227 <br /> www.iztienv.com <br /> g E <br /> cSV DD <br /> RE <br /> April 1, 2010 APR _0 9 2010 <br /> ENVIRONMENT HEALTH <br /> Project No.: 770.2 PERMMSERVUS <br /> Project Name: Marci Property <br /> Mrs. Margaret Marci <br /> 20 Mobile Lane <br /> Crescent City, CA 95531 <br /> RE: 1"Quarter 2010 Monitoring Report <br /> Marci Property, 2969 Loomis Road, Stockton, CA <br /> Dear Mrs. Marci: <br /> i <br /> Geological Technics Inc. has prepared.this Groundwater Monitoring Report for the 1St Quarter <br /> 2010 in letter format, in compliance with C.C.R. Title 23, Division 3, Chapter 16 Section 2652. <br /> This quarterly report summarizes activities for the first quarter of 2010, and outlines the next <br /> proposed sampling and analysis event. <br /> 1St Quarter 2009 Activities <br /> No sampling and analysis of groundwater monitoring wells took place during the first quarter of <br /> 2010, per correspondence prepared by San Joaquim County Environmental Health Department <br /> dated June 5, 2009, which approved semi-annual monitoring during the second and fourth <br /> quarters, and annual monitoring during the fourth quarter. <br /> In a letter dated December 21, 2009, GTI requested an,extension of the date for completing three <br /> dual phase extraction pilot tests that were conditionally approved by SJC EHD in their <br /> correspondence dated March 23, 2009. GTI requested an extension such that the pilot tests <br /> would be completed by March 31, 2010, and the report of findings would be submitted by May <br /> 30, 2010. SJC EHD approved the extension request in their correspondence dated December 21, <br /> 2009. <br /> On January 19th through 21St, 2010, three extraction wells were installed at the site in accordance <br /> with the WP. Pilot test equipment was mobilized at the site, including the soil vapor extraction <br /> unit with thermal oxidizer, a diesel generator, propane, water tank and temporary fencing. GTI <br /> I I <br /> i <br /> 770 1 st qtr 10 1tr format.docx 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.