My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 7:55:35 PM
Creation date
3/9/2020 9:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ced�ogcc� Tec �tccs lac. � <br /> 1172 Kansas Avenue <br /> Modesto, 95351 <br /> 209.522.41111 9 <br /> 209.522.4227(fax) <br /> gti@gtienv.com <br /> DECI 2 3 2009 <br /> December 21, 2009 ENVIRONMENT HEALTH. <br /> PERMIT/SERVICES <br /> Project No.: 770.2 <br /> Project Name: Marci Property(Loomis) <br /> San Joaquin County Environmental Health Department <br /> 600 East Main Street <br /> Stockton,CA <br /> 95202-2708 <br /> Attention: Victoria McCartney,RENS <br /> Senior Registered Environmental Health Specialist <br /> Regarding: Margaret Marci Property <br /> 2969 Loomis Road . <br /> 'Stockton, California 95205 <br /> Dear Ms. McCartney: <br /> GTI prepared and submitted a revised work plan for Additional Dual Phase Extraction Pilot Test for the <br /> above property. In correspondence dated March 23, 2009, SJC EHD approved the work plan and directed <br /> that pilot tests be completed by June 12, 2009, and a report of findings be submitted to EHD within sixty <br /> days of completing the tests. In correspondence dated October 1, 2009, GTI respectfully requested an <br /> extension of thepilot test implementation and subsequent::report of findings to January 31, 2010 and <br /> March 31, 2010_respectively.4SJC.EHD approved the extension request in correspondence dated October <br /> 9, 2009:''' <br /> We have been in the planning and permitting process to install the equipment needed to conduct the pilot <br /> tests, and are currently coordinating.with the San Joaquin Valley Air.District,for an Authority to Construct <br /> j Permit. <br /> On behalf of Mrs.Margaret Marci, we respectfully request that the due date for the completion of the pilot <br /> tests be extended to March 31, 2010, and the due date for the report of findings to be extended to May 30, <br /> 2010. Please note that GTI will be moving forward with the pilot installation work plan as soon as <br /> possible, and hope to have the work completed-as.quickly as possible. <br /> It is my understanding that an additional $30 payment for the drilling permitting was.mailed to SJC-on <br /> December 16, 2009: Please let me know if you do not receive this before the end of this week. <br /> Thank you, <br /> - Tamorah Bryant,_ ..E. <br /> - , *' _51 <br /> cc. James L Barton-CRWQCB CVR <br /> 2T-CFP <br /> s.Margaret Marci <br /> 1V�r.John Marci,Jr. <br /> _.� _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.