My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003807
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
ARCHIVED REPORTS_XR0003807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 8:18:18 PM
Creation date
3/9/2020 10:07:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003807
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gravel packed perforations with Lonestar sieve mix # 2/12 <br /> from 83 1/2 ' to 66' (2 1/2" above perfs . ) , hydrated <br /> bentonite pellets from 66 ' to 631 . Packing was done with <br /> flights in hole to ensure placement of gravel . The well was <br />' then cemented from 63 ' to the surface with a cement, 2% <br /> bentonite slurry, pumped into the annulus using a tremie <br /> ' hose . <br /> SURFACE COMPLETION <br /> ' All three wells were completed at the surface, using a <br /> Universal Well Vault, marked "Observation Monitor Well " . The <br /> well vault was cemented in place with cement-sand grout and <br /> ' marked as Nos . 1 , 2 and 3 . The cast iron top is screwed on <br /> requiring a socket wrench to remove, inside, the well casing <br /> is plugged with an expandable, locking cap, keys left at <br /> ' Marci Diesel across the street. <br /> WELL DEVELOPMENT <br /> ' On April 8, 1992, all three wells were developed using rods <br /> and a rubber disk surge block (different sizes for the 2" <br /> and 4" wells) . Each well was surged for about 15 minutes and <br /> ' then bailed with appropriate sized bailers until 5 volumes <br /> of the standing head in each well had been removed. Water <br /> samples were not collected This was done at a later time by <br /> Del Tech Geotechnical Services as detailed below. <br /> RESULTS OF SOIL SAMPLE TESTS <br /> CHART A <br /> ' SOIL SAMPLES TAKEN APRIL 3 & 7, 1992 <br /> Units • mg/kg = ppm <br /> ND = not detectable at limit shown <br /> t EPA: 8020: DLR . 005 mg/kg <br /> 5030 : DLR 1 . 0 mg/kg <br /> * Diluted sample owing to instrument saturation <br /> ' Benzene Toluene E'Benzene Xylene (TPH--G) (TPH-D) <br /> ' MW # 1 EPA. 8020 EPA. 5030 <br /> SAMPLE # <br /> 1 @ 26' ND ND ND ND ND ND <br /> ' 2 @ 36 ' ND ND ND ND ND 140 <br /> 3 @ 48 . 5 ' ND . 033* . 030* .240* ND 66 <br /> 4 @ 58 . 5 ' ND . 020* .025* .034* ND 69 <br /> 5 @ 68 . 5 ND . 012* ND .094* ND 21 <br /> 6 @ 77 ' ND ND ND ND ND 2 .9 <br />' 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.