Laserfiche WebLink
Fuller Mobile Home Park <br /> 365 East Louuse Avenue,Lathrop, California September 6, 1994 <br /> Phase HAdditional Site Characterization Page. 4 <br /> I <br /> 3.l Drilling h <br /> Permits will be obtained as necessary for all wells (including borings) before <br /> drilling begins. The soil boring will be accomplished using a m&bile mounted <br /> drilling rig employing the�'use of a hollow stem flight auger no less than 3 114-inch <br /> i.d. and 8 7/8 o.d. 1�i <br /> All drilling equipment l be thoroughly steam-cleaned before drilling begins, to <br /> prevent the introductionA of contamination from off site, and between borings to <br /> prevent cross contamination. <br /> i <br /> The borings will be logg leld under the direct supervision of a registered professional <br /> ! using the Unified Soil :'Classification System (Figure 3). The color, texture, <br /> moisture, plasticity (if applicable), consistency of the earth materials; pertinent soil <br /> or bedrock characteristics and any evidence of contamination will be noted. All <br /> water bearing zones and;the depths at which they were encountered will be noted <br /> on these logs. <br /> All borings will be drilled in such a manner as to prevent cross ,contamination <br /> _ '�� <br /> between strata. Exploratory soil borings within the unsaturated, zone will be <br /> backfilled with a cement and tl-tree percent(3%) Bentonite mixture. f <br /> Borings into the saturated� zone will be drilled to a maximum of 20 feet beneath the <br /> top of the aquifer being explored. Any perching layers encountered will be <br /> investigated to a maximdiii thickness of S feet and will be backfilled:'with concrete <br /> slurry, after a Bentonite seal has been placed. If a deeper aquifer is to be <br /> investigated, conductor easing will first be grouted into place to seal off the upper <br /> iM <br /> aquifer(s), in series, if necessary, and drilling will proceed throughithe conductor <br /> casing afar the grout��has been allowed to set properly. I#' evidence of <br /> contamination is noted during the drilling, the drilling will be halted until the <br /> responsible professional determines the advisability of deeper drilling'. <br /> i! <br /> Upon termination, the 11oring into the saturated zone will be completed as a <br /> monitoring well and backfilled with concrete grout, after a Bentonite seal has been <br /> placed. The boring for the monitoring well will be of a diameter atlleast 4 inches <br /> greater than the 2 inch diameter of the well casing to be used. <br /> The cuttings from the drilling operation will be containerized on-site during drilling <br /> for proper disposition. he proper method of disposal will be dependent upon <br /> results of laboratory analysis. This disposal will be the responsibility of the client <br /> unless other arrangements have been made. ;� <br />