My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004918
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
365
>
3500 - Local Oversight Program
>
PR0545431
>
ARCHIVED REPORTS_XR0004918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 3:52:10 PM
Creation date
3/9/2020 1:03:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004918
RECORD_ID
PR0545431
PE
3528
FACILITY_ID
FA0005191
FACILITY_NAME
FULLER MOBILE HOME PARK
STREET_NUMBER
365
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627022
CURRENT_STATUS
02
SITE_LOCATION
365 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> WHF Environmental Consultants, Ine- <br /> Health & Safety Plan for Fuller Mobile Home Park <br /> • Page: 2 <br /> 3 Assuring that personnel are aware of the potential hazards associated with site <br /> operations <br /> 4 Monitoring the safety performance of all personnel to ensure that the required <br /> work practices are employed <br /> 5 Correcting any work practices or conditions that may result m injury or exposure <br /> to hazardous substances <br /> E6 Preparing any accident/incident reports (see attached Accident Report Form) <br /> 1.4 Project Employee <br /> Project Employees involved in on-site investigations are responsible for <br /> I Taking all reasonable precautions to prevent injury to themselves and to their <br /> fellow employees <br /> 2 Implementing Health and Safety Prograin and reporting to the PSO for any action <br /> deviating from the anticipated conditions described in the Health and Safety Plan <br /> 15 Speciallnstructtons <br /> It is the responsibility of the Project Manager and the Health and Safety Manager to <br /> P tY J g <br /> review the available site information to determine, to what degree the Health and Safety <br /> Plan will be implemented Each site will be handled on a case by case basis This site, <br /> because of the nature and known levels of contaminates, has been identified as a Level "D" <br /> entry Based on US EPA rating criteria for entry, this site requires a minimum of <br /> protection This will include rubber boots, tyvek, gloves, and hard hats <br /> Should for any reason, conditions change, the site will be elevated to an appropriate level <br /> of entry for safe working, based on the Project Safety Officer (PSO) and Project Manager <br /> (PM) <br /> Should at any time the level of entry change, the remaining specific safety equipment and <br /> precautions can be implemented by the manager as required This is fully defined m the <br /> following sections <br />
The URL can be used to link to this page
Your browser does not support the video tag.