Laserfiche WebLink
1 <br />' WHF Environmental Consultants, Inc. <br /> Health & Safety Plan for Fuller Mobile Home Park <br /> iPage: 3 <br />' 2.0 Safety Implementation <br />' The provisions of the WHF Environmental Consultants, Inc Health and Safety Plan are <br /> mandatory for all personnel associated with the site project and operations <br /> A complete background review and site visitation will be conducted in order to determine whether <br /> specific amendments are to be made to the Health and Safety Plan based on specific <br /> characteristics which may exist on the job site Any suspected hazards associated with the on-site <br />' operation which exposure to, via inhalation or skin absorption, to such as suspected carcinogens <br /> or human stenlants, will be documented and specific guidance will be developed and added to this <br />' Health and Safety Plan as Appendices <br /> A defined project site layout is paramount to the safe completion of all remedial site <br />' investigations The project site layout has buaIt_m safety features The site as divided into three <br /> zones The following list defines the required personnel protective equipment <br /> 2.1 Personnel Protective Equipment (PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site will use the <br /> following protective equipment and measures as warrant by the Project Manager <br />' • Coveralls as an undergarment <br /> • Saranex outer garment <br />' + Sample gloves (inner) <br /> • PVC, Nitnle or Neoprene outer gloves <br /> • Hard hat <br /> • Steel toe boots <br /> • Robars or Tingley boots <br /> • Full face piece respirator with R53HE cartridges (a combination of organic vapor, <br /> acid gas, pesticide, radionuclide, high efficiency filter) Note that cartridges should <br />' be changed daily <br /> • All joints to be taped <br /> • Self-contained air will be utilized if project dictates <br /> More stringent protective equipment requirements will be implemented if necessary This <br />' determination will be made by the project supervisor after review of the materials to be <br /> handled, the ambient monitoring data, consultation with on-site technical personnel, the <br /> Safety Officer, and the proper management personnel Upgrades in PPE, if necessary, will <br />' be implemented <br />