Laserfiche WebLink
WHF Environmental Consultants, Ina <br /> Health & Safety Plan for Fuller Mobile Home Park <br /> Page: 3 <br /> L <br /> 2.0 Safety Implementation <br /> The provisions of the WHF Environmental Consultants, Inc. Health and Safety Plan are <br /> E� mandatory for all personnel associated with the site project and operations. <br /> A complete background review and site visitation will be conducted in order to determine whether <br /> specific amendments are to be made to the Health and Safety Plan based on specific <br /> characteristics which may exist on the job site. Any suspected hazards associated with the on-site <br /> operation which exposure to, via inhalation or skin absorption, to such as suspected carcinogens <br /> or human sterilants, will be documented and specific guidance will be developed and added to this <br /> f Health and Safety Plan as Appendices. <br /> L A defined project site layout is paramount to the safe completion of all remedial site <br /> L investigations. The project site layout has built-in safety features. The site is divided into three <br /> zones. The following list defines the required personnel protective equipment. <br /> L2.1 Personnel Protective Equipment (PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site will use the <br /> following protective equipment and measures as warrant by the Project Manager: <br /> • Coveralls as an undergarment <br /> L • Saranex outer garment <br /> • Sample gloves (inner) <br /> • PVC, Nitrile or Neoprene outer gloves <br /> • Hard hat <br /> • Steel toe boots <br /> • Robars or Tingley boots <br /> • Full face piece respirator with R53HE cartridges (a combination of organic vapor, <br /> acid gas, pesticide, radionuclide, high efficiency filter). Note that cartridges should <br /> be changed daily. <br /> • All joints to be taped <br /> • Self-contained air will be utilized if project dictates <br /> More stringent protective equipment requirements will be implemented if necessary. This <br /> determination will be made by the project supervisor after review of the materials to be <br /> handled, the ambient monitoring data, consultation with on-site technical personnel, the <br /> Safety Officer, and the proper management personnel. Upgrades in PPE, if necessary, will <br /> be implemented. <br />