My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
7910
>
3500 - Local Oversight Program
>
PR0545441
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 4:24:01 PM
Creation date
3/9/2020 2:37:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545441
PE
3528
FACILITY_ID
FA0003733
FACILITY_NAME
NORTH SIDE SHELL
STREET_NUMBER
7910
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
07949006
CURRENT_STATUS
02
SITE_LOCATION
7910 LOWER SACRAMENTO RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fiI J <br /> J <br /> Ms. Mary Meays <br /> • "' it I� ! <br /> August 29, 1991 } <br /> Page 3 i. <br /> Item 4. yl +i ji <br /> Comment: Upon investigation during a site visit on June 5, 1991, pipes leading to <br /> a 120-gallon pressure tank from the ground were located behind the <br /> store. Please provide information with regards to the well which has <br /> been located on previous site maps. ; <br /> Response: Delta initially prepared a site base map for this site using a blue print A' <br /> map (dated October 13, 1961) obtained from Shell Oil Company. The ai I is <br /> blue print displayed an on-site well. On March 2, 1990,the Department 4� <br /> of Water Resources (DWR) was contacted to investigate the presence <br /> of a private well. No record of a private well was on file with the DWR. 4 31 <br /> A site visit was made and confirmed that a well casing or water pressure , <br /> tank are not located on the site. An additional blue-print dated 1988 has ' i# <br /> been obtained and indicates that no private well is located at the site. i !' <br /> Site maps have since been revised indicating that no private well is <br /> located at this site. It is unknown why a well was displayed on the 1961 <br /> blue print map. `.q si <br /> 9 <br /> On August 15, 1991, you met with a Delta representative at the site. i <br /> During this meeting, confirmation was made that the pressure tank ' I. <br /> located behind the building was an air pressure tank and that a well is <br /> not evident at the site. ; <br /> {! 7 <br /> If you have any questions or_concerns regarding this letter, please call me at'(916) 638-2085. " <br /> Sincerely, t . <br /> DELTA ENVIRONMENTAL CONSULTANTS, INC. as j <br /> Lisa Rainger ? s� <br /> Project Manager <br /> LR:ecd <br /> Enclosures 10. <br /> cc/enc: Mr. Jack Brastad, Shell Oil Company <br /> cc: Mr. Jim Brownell, Delta Environmental Consultants, Inc. - <br /> - %L , <br /> j 3 : <br />
The URL can be used to link to this page
Your browser does not support the video tag.