Laserfiche WebLink
3 <br /> CAMBRIA <br /> Schedule <br /> Cambria is prepared to begin work upon receiving written approval of this work plan by <br /> S7CEHD and an approved well permit. <br /> If you have any questions regarding the scope of work outlined in this work plan, please calk <br /> Aubrey Cool at(707) 933-2368. <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> Aubrey K. Cool <br /> Project Geologist <br /> GEO� <br /> QH W �FOc� <br /> Jo"W' v. �-� <br /> Senior Project Geologist No.6927 • <br /> kG 6927 <br /> w9�OF CA1.1CA <br /> Attachments <br /> Table 1. Soil Analytical Data--Northwestern Dispeenser. <br /> Table 2. Grab Water Analytical Data—Northwestern Dispenser <br /> Figure 1. Site Vicinity Map <br /> Figure 2. Site Plan/Proposed Boring Location Map <br /> Appendix A. Boring Logs—SB-1,B-i', and B-2 <br /> cc: Ms. Karen Petryna, Shell Oil Products US <br /> Mr..Marty Hartzell, Central Valley Regional Water Quality Control Board <br /> Mr. J.E.McNeilis (Property Owner) <br /> 0832 S <br />