Laserfiche WebLink
FIGURE 3. PROJECT SCHEDULE-Stockton Developmental Center,Stockton,California <br /> May June <br /> Name Duration 21122123124125126127128129130 112 13 14 15 16 17 18 19 ji0j 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 15 16 7 18 19 110111 j12113114115 16 17 18 19 20 <br /> Task 1.PLANNING AND PERMITTING 12d <br /> Regulatory Review of Workplan 10d <br /> Permitting Id <br /> Preliminary Site Inspection Id 0 <br /> Task 2.SOIL AND GROUNDWATER i l d <br /> INVESTIGATION <br /> Groundwater Grab and Soil Sampling 2d <br /> (Geoprobe) <br /> Laboratory Analysis Turn-around 10d <br /> Task 3.LABORATORY ANALYSIS 10d <br /> Geoprobe Sample Analysis 10d <br /> Task 4.PRELIMINARY INVESTIGATION 20d <br /> EVALUATION REPORT <br /> Report Preparation 10d <br /> Client Review of Report 5d <br /> Incorporate Client Comments and Submit 5d <br /> Final Report <br /> C, <br />