My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004665
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
151
>
3500 - Local Oversight Program
>
PR0545482
>
ARCHIVED REPORTS_XR0004665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 11:56:10 AM
Creation date
3/10/2020 9:06:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004665
RECORD_ID
PR0545482
PE
3528
FACILITY_ID
FA0005075
FACILITY_NAME
DONS MOBILE GLASS
STREET_NUMBER
151
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
953365719
APN
21941015
CURRENT_STATUS
02
SITE_LOCATION
151 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Correcme Action Plan <br /> I <br /> I Mayor System Components <br /> Four SVE/Ground,,kater Extraction Wells <br /> Four 5-gpm Electric Turbine Groundwater Pumps <br /> Double-Contained Groundwater Transport Piping <br /> One Particle Filter <br /> Two 1,000-1b Aqueous-Phase GAC Canisters <br /> The design capacity of the groundwater extraction/treatment will be 15 gpm for normal operation, <br /> however, easy, inexpensive modification (larger capacity turbine pumps) can accommodate <br /> production of up to 35 gpm <br /> 4 Dual-Phase SVE and Groundwater Treatment System <br /> IBoth the soil vapor and groundwater treatments stems will be fabricated in DST's proprietary <br /> Mobile Interchangeable Treatment System (MITS) configuration delivered to the site ready for <br /> hook-up and operation The system is fully housed in a secure metal container with dimensions <br /> of 8' x 20' x 8', generally requiring no concrete pad or footings for its installation The container <br /> is double-lined for noise abatement, and double-containment under the aqueous-phase GAC is <br /> provided to contain accidental discharge of water All soil vapor and groundwater transport <br /> piping and utilities will converge at and emanate from the NETS unit's standard connection port <br /> (SCP) The dual-phase treatment system and connecting piping will be located as illustrated on <br /> Figure 5 A flow diagram showing the mayor dual treatment system components is presented on <br /> Figure 6 <br /> 60 PROPOSED CLEANUP GOALS <br /> Except for the excessive concentrations of TPH and benzene, the site meets man of the criteria <br /> P g Y <br /> of a low-risk groundwater case The actual cleanup standard for fuel leak cases have been <br /> evolving over the past two years since the Lawrence Livermore National Laboratory <br /> recommendations concerning UST leak sites were promulgated OST anticipates reductions of <br /> 1 TPHg and benzene of 95 percent or more will be achieved by the proposed remediation program <br /> OST <br /> 1 701 1-2 cap Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.