Laserfiche WebLink
April 11, 2007 <br /> NOA Project Number: E07055A <br /> 4.0 PROPOSED TIME SCHEDULE FOR WORK <br /> Assuming approval of this workplan, we propose to perform the work between April 17 and <br /> April 20, 2007. Standard laboratory turn-around is five business days. We will forward the <br /> results of the work to the EHD within one week of receipt of the laboratory results. <br /> 5.0 REPORT PREPARATION <br /> A letter report will be prepared to present the analytical test results for the soil samples. <br /> The letter report will include laboratory test result sheets and chain-of-custody <br /> documentation. <br /> 6.0 LIMITATIONS <br /> The proposed scope of work for the Phase II has been tailored to address the specific issue of <br /> the former underground storage tank on the property. If additional investigation is <br /> requested, such investigation will be performed as a separate scope of work. <br /> 7.0 SIGNATURES OF ENVIRONMENTAL PROFESSIONALS <br /> This workplan has been prepared under the supervision and direction of the undersigned. <br /> Neil 0. Anderson 8 Associates, Inc. <br /> Abigailcco <br /> Project cientist oQROFFSS�O �{(.5g`O GAG{O <br /> aZ' �c0.R0g�2 F.� aO JAMES D. Wt <br /> oZ z ROBINSON <br /> �„ • <br /> of <br /> m No 7834 • <br /> No. C6 <br /> Exp 045 z I Q <br /> j. A -71di <br /> J es D. Robinson, 6 .98 � 9 <br /> for Project Manage sTgTF CwltO��`F�' OF CA `FOQ <br /> PG-7834, RCE-69045 OF CAOc <br /> 4 <br />