Laserfiche WebLink
ft - RUN <br /> f. WIN. WHOM, <br /> - y <br /> y I ' <br /> I= <br /> 3G - <br /> Mitigation Work Plan AGS 86102-2P <br /> Beacon Station #3-492, Manteca, California May 26, 1987 <br /> the monitoring program. A final report will be prepared at the <br /> end of the project documenting the work elements involved and the <br /> results of the mitigation system. All information gathered <br /> during this project will be considered confidential, and released <br /> only with the authorization of Beacon Oil Company. <br /> PROJECT PERSONNEL <br /> 0 <br /> i . <br /> Michael N. Clark, a Registered Geologist (R..7. .38fi8) and <br /> f Certified Engineering Geologist (C.E.G. 1264) in the state of <br /> California, will be overall charge of the <br /> project. Andrew P. <br /> f Lush, Project Geologist, will manage field and office operations <br /> of the project. Applied GeoSystems employs a staff of <br /> geologists <br /> and technicians who will. be used to perform various aspects of <br /> the program and see the job through to completion. <br /> S- <br /> 11 <br /> COOS�r��d/!!�. <br />