My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1405
>
3500 - Local Oversight Program
>
PR0545492
>
SITE INFORMATION AND CORRESPONDENCE_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 10:20:03 AM
Creation date
3/10/2020 12:05:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0545492
PE
3528
FACILITY_ID
FA0000309
FACILITY_NAME
MCHENRY STATION & MINI MART
STREET_NUMBER
1405
STREET_NAME
MAIN
STREET_TYPE
ST
City
ESCALON
Zip
95320
CURRENT_STATUS
02
SITE_LOCATION
1405 MAIN ST
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( t <br /> 1405 Main Street, Escalon <br /> Page 2 <br /> 08/26/98 The backhoe was repaired, and a diesel tank pit sample was collected at <br /> 14.5 feet bsg. Analysis reported 34 ppm TPHd in the sample. <br /> 11/23/98 Sampling of piping areas occurred this date. The subcontractor <br /> demolishing the building removed all piping, without permission or <br /> inspection so sample locations were at our best judgment. Using EPA <br /> Method 8260 MtBE analyses was ND for all samples. The deepest sample <br /> was 10 feet bsg. A piping sample collected at 5 feet bsg near the former <br /> diesel tank pit area had 18,000 ppm TPH-d. <br /> 12/09/98 Re-sampling of piping areas occurred this date. Samples were collected at <br /> 17.5-, 18- and 19 feet bsg. The highest reported contaminant <br /> concentration was 580 ppm TPHd in the 19-foot sample. There was a <br /> significant reduction in TPH-d contamination from 5 feet to 19 feet and <br /> EHD determined further investigation wasn't required because depth to <br /> water was 60 feet bsg, the 1996-97 investigations provided lateral and <br /> vertical contaminant information and the site was going to be part of Hwy <br /> 120. Stockpiled soil was returned to the excavations. <br /> 10/02/03 "REPORT: Risk Evaluation &Appendix B Site Closure Checklist' dated <br /> September 29, 2003 submitted this date. The report refers to information <br /> on UST cleanup sites at 1305 and 1360 Escalon Avenue where the <br /> groundwater flow is westerly, water samples from the monitoring wells are <br /> non detect and the well survey identified the closest receptors to be two <br /> City of Escalon wells that are over 600 feet away and upgradient of this <br /> site. The report requested site closure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.