Laserfiche WebLink
209-468-3442 <br /> gagonzalez2sj cehd.com <br /> REASON FOR DENIAL <br /> ----------------- <br /> Page 2 of 3: MW-2 and MW-3 listed twice (once at 30 ft. bsg and again at 50 ft. bsg). <br /> Table 1: MW-I 1 destruction method is listed as pressure grout whereas the work plan narrative proposes to <br /> destroy MW-1 I by over-drill. <br /> Table 4: Sample ID 2@0.5-l' lists MTBE as 260*/430. Previous reports have this data listed as 260*/340. <br /> Table 4: OZ2-27 TPH-g data does not agree with laboratory results. <br /> Table 4: Samples OZI-15 through VW-1-15 were not analyzed for DIPE, ETBE, 1,2-DCA, and EDB according <br /> to laboratory data in the Well Installation and Additional Site Assessment Report (2012), yet this table includes <br /> data for these chemicals. <br /> Please reupload a correct work plan to GeoTracker at your earliest convenience. <br /> 3 <br />