Laserfiche WebLink
,oyal Oak Savings& Lana <br /> l7naI Remediation Plan <br /> Addendwn#II <br /> Groundwater Remediation <br /> page: 6 <br /> MNV-7 1216 Non MAW <br /> 12128 Benzenc=25.3 t4911 <br /> Toluene=3.3 p9il <br /> Ethyl Benzene=3.1 µb11 <br /> Total Xylene 180 P91i <br /> sampling rounds. <br /> 2 decreased between the two <br /> Benzene concentrations in MW- <br /> tl between the <br /> Benzene concentrations in MW-7 increased fro <br /> -7 <br /> Detect to 25.3 lig <br /> two sampling rounes. <br /> See Plate 5). Benzene <br /> Well MNY-2 is the furthest UP-Grad <br /> -G Zd�ndtincreasedell at ii�n sMWite(7 b ween tile <br /> leave moved ag <br /> �.to <br /> concentrations decreased in 2 and'TA -7 may data at present <br /> rounds. We suspect that the contiamination to do not have enough <br /> the Royal Oak Sit <br /> fcall however.rom X11 nt UST 5_.e. <br /> to state this emphatically <br /> 5.0 °ROPOSED PT MEDIATION XAN r°undwatcr <br /> WH'F Environmental Consultants would like to present the following g <br /> for our cansiderataon. We would like to begin imple�}1entat�on of Hass <br /> treatment plan y reciate an expeditious review of this rt <br /> Plan on February 4, 1991, so we would app <br /> document. <br /> ch ule ,th continuous pumping of water using a submersible gumP <br /> from <br /> February 4, 1991 -Bel, ive us a capture radius of <br /> gallons r minute. Thi.:will g Into the <br /> Well#5 at a rate of 3.5 g l7e un, in Water will be pumped <br /> approximately 8g feet by the loth day of P P 9 <br /> lo,000gallon tank already on site. <br /> dam lines Schen le r +E will be taken from Fells <br /> For the first 7 days, a daily test for Gasoline + BT}+ anon tan:c <br /> 2,4,d, and 7. A sample will also be taken from the 30,0 g <br /> we will discharge the contents on the <br /> if the water Sample from the tank is. if detect, <br /> k we will <br /> site to help camtact the soils onsite. 1f detectable levels are found lit the tan <br />