Laserfiche WebLink
r <br /> Royal Oak Savings&Loan <br /> Final Remediation Plan <br /> Addendum#IX <br /> Groundwater Remediation <br /> Page: 7 <br /> pre-treat water through a carbon drum, and discharge to the site or the City sewer <br /> system. <br /> These samples will all be analyzed on a rush basis, and no discharge of tank contents <br /> will occur until analytical result;are known. <br /> If after 7 days of sampling the tank continues to be ND, we would stop daily sampling, <br /> while continuing to pump, and wait 7 days. If the results are again ND then we would <br /> sample again 14 days later. <br /> Proposed sampling schedule for wells and tanks: <br /> February-5,6,7,8,9,10, and 18 <br /> March-4 <br /> If after any given sampling round the perimeter wells are found to be ND, we will <br /> cease pumping, wait 7 days, and take a verification sampling round. If this round <br /> verifies the ND's, we will ask for closure of this site, subject to 3 more Quarterly <br /> sampling rounds of ND on all of the wells. <br />