Laserfiche WebLink
Rvyed Oak Savings&Loan <br /> Final Rmiellation Plan <br /> Page. 6 <br /> The other options being considered are: <br /> 1. No action; monitor the wells and report findings to the County and the <br /> Regional Water Quality Control Board. <br /> 2. Pursue an NPDES permit for discharge to the storm drainage problem. <br /> 3. Construct a groundwater injection well, and discharge treated water back <br /> into the same aquifer. <br /> These options should not came into consideration, as WHF Enviuonmental <br /> believes that there is no reasonable reason to withhold approval for discharge to <br /> the POTW. <br /> Previous monitoring well sampling data shows changes in contaminant levels in <br /> all of the wells. There is not enough data to make any conclusions,however, <br /> WHIP Environmental believes that there may be an off-site source affecting this <br /> .. site. <br /> i <br /> When groundwater a%traction is performed as the final remedial step,WBF <br /> f ° believes that we may bring groundwater from bath the south and west that will <br /> l be intercepted in the monitoring wells,and that elevated contaminant levels, if <br /> they occur,will be a result of off-site contamination. <br /> 1 <br /> E � ' <br /> las, <br /> 4 <br /> 3F <br /> i <br /> W.{ <br /> I <br />