Laserfiche WebLink
• FIRST QUARTER,2002 <br /> GROUNDWATER MONITORING REPORT <br /> JAMAR OIL DISTRIBUTION <br /> JUNE 2002 <br /> TPH D was detected in wells MW-1 through MW4 this quarter at concentrations ranging from <br /> 1,910 µg/1 in the sampling from MW-3, to 574µg11 in the sample from MW-4 <br /> Benzene was detected in samples from all wells at concentrations ranging from ranging from <br /> 30,000µg11, in the sample from MW-1,to 11 µg/1 in the sample from MW-5. <br /> MTBE was detected in samples from MW-1,MW-2, and MW-4 at 220,000µg11,280,ug/l, and <br /> 5,700µg11,respectively <br /> Toluene was detected in samples collected from MW-1, MW-2,MW-3 and MW-5 at 2,000µg11, <br /> 474µg/1, 550µg/1 and 5 5 µgll,respectively Ethylbenzene was detected in the sample collected <br /> from MW-3 at 110µg/l Total xylenes were detected in samples collected from MW-1,MW-3, <br /> MW-4 and MW-5 at 1,100µg11, 980µg11,230µgll and 3 7µg/1, respectively Tertiarybutyl <br /> alcohol(TBA)was detected in the sample collected from MW-5 at 41 µg/l 1,2 DCA was <br /> detected in the sample collected from MW-1 at 2,700µg/1 DIPE,ETBE, TAME, and EDB were <br /> non-detect in all samples taken this quarter <br /> • Groundwater analytical data are summarized in Table 2 and shown on Figure 5 Copies of the <br /> laboratory reports with COC documentation are included in Appendix B <br /> CONCLUSIONS <br /> Generally,the petroleum hydrocarbon concentrations and MTBE have remained relatively <br /> consistent over the last two years. However,the extent of impacted groundwater remains <br /> undefined at the site 1, 2 DCA was detected for the fust tune this quarter in the sample from <br /> MW-1 Samples from MW-5 continue to show detectable concentrates from TBA This is the <br /> only well on-site where samples have shown relatively consistent TBA concentrations,possibly <br /> indicating and upgradient source. GHH will continue to monitor the site on a quarterly basis <br /> SCHEDULE <br /> The next quarterly monitoring event is scheduled for June 2002 The Second Quarter Monitoring <br /> Report will be submitted on July 31, 2002 <br /> 5 <br />