Laserfiche WebLink
I <br /> i <br /> FIRST QUARTER,2002 <br /> GROUNDWATER MONITORING REPORT <br /> JAMAR OIL DISTRIBUTION <br /> JUNE 2002 <br /> PREPARATION OF REPORT <br /> Firm Preparing Report: <br /> GHH Engineering,Inc. <br /> 11960 Heritage Oak Place ##2B <br /> Auburn,California 95603 <br /> Report Prepared By: <br /> This report was prepared by GHH Engineering,Inc Mr Thomas E. Ballard (R.G #7299), <br /> Principal Geologist, is the qualified person responsible for overseeing this protect This report <br /> was written by Mr Kirk E Moberg, Project Engineer,and reviewed for technical content by Ms <br /> Heidi Hubbard, Supervising Geologist and Mr.Ballard <br /> The analysis, conclusions and recommendations submitted in this report are based upon the best <br /> • available information obtained from the field nnvesbgation,persons knowledgeable about the site, and <br /> local government agencies. However,the regulatory agencies may have additional recommendations <br /> after they have reviewed and evaluated the data All information presented is believed to be factual <br /> unless proven otherwise This report was prepared to assist the property owner in the evaluation of <br /> the site <br /> This report has been reviewed by the client and they concur with the findings herein If you have any <br /> questions or need additional information,please call GHH at(5 30) 886-3100 <br /> Thank You, <br /> Heid Hubbard <br /> Suing Geologist DOW E� <br /> ft0.7M <br /> Thomas E Ballard, R G cN.� <br /> Executive Director <br /> F 1518718.eportsltbletlQMRistQtr2002 wpd <br /> pc Mr Marty Hartzell, CVRWQCB (Regional Board) <br /> . Ms Lon Duncan, San Joaquin County <br />