Laserfiche WebLink
Beacon Station No.474 June 5, 1998 <br /> Stockton,California Work Plan <br /> E wells may be tested to evaluate the effectiveness of vapor extraction on other <br /> stratigraphic zones and wells. <br /> At the completion of the VET the vacuum will be shut off while air is injected <br /> i <br /> into air-sparge well AS-1 by a Gast 1 horsepower oilless rotary vane <br /> compressor for approximately six hours. Then a combination ASIVET will be <br /> ' conducted for approximately two hours in length, which may be increased or <br /> 'G decreased depending on the field results. <br /> ? 1 <br /> A Selected monitoring wells will be monitored fore influence of the air-sparging <br /> } by testing for dissolved oxygen, vapor pressure, and other related parameters to <br /> J <br /> 4 evaluate the effectiveness of the tests. Monitoring of the VET and ASNET <br /> . will be performed"in 15 to 30 minute increments for the duration of the tests. } <br /> The influent, midpoint, and effluent vapor streams will be monitored to confirm <br /> abatement efficiency. Monitoring equipment will include a Horiba <br /> hydrocarbon analyzer for measuring hydrocarbon concentrations, averaging <br /> `r pitot tubes for measuring flow rates, and differential pressure gauges for <br /> monitoring change's in air pressure on selected wells. Vapor samples will be <br /> collected at the end of the tests from the influent vapor stream prior to entering 9 <br /> the blower and from the effluent vapor stream after exiting the second carbon <br /> vessel. Vapor samples will be collected with a sampling pump into Tedlar bags <br /> yand transported under COC and submitted for laboratory analyses for TPHg <br /> 'k and BTEX. <br /> } j k <br /> �. Task 4 Prepare and submit a report detailing field methods, results, and conclusions of <br /> the investigation and summarizing results of the site assessment to date with + <br /> s <br /> recommendations :'for remedial action. If sufficient data is collected,;'a <br /> 11 iI <br /> I Corrective Action Plan (CAP) will be prepared. <br /> ell- <br /> 4 1474-22.wp 5 HORIZON ENVIRONMENTAL INC. <br />